Laserfiche WebLink
is c U <br /> f <br /> RAMAGE ENVIRONMENTAL <br /> Site Health and Safety Plan <br /> I. GENERAL INFORMATION <br /> t <br /> G <br /> x Date: August 29, 1997 <br /> Project Name: San Joaquin County Canlis Building <br /> W Project Site Location: 24 South Hunter Street, Stockton, California <br /> Client Contact: Craig Ogata Phone: (209)468-8910 <br /> Director, Facilities Management <br /> San Joaquin County <br /> t <br /> Project Manager: Joseph Ramage Date: $ Z 9 19} <br /> The Project Manager is responsible for all onsite activities, including having all appropriate plans <br /> U; prepared and distributing the plans to field personnel and to authorized representatives of each <br /> subcontractor employed to perform work on site. The Project Manager is also responsible for <br /> ensuring that the provisions of the Health and Safety Plan (HSP) are carried out. This includes <br /> ensuring that all field personnel have received adequate training, that an adequate supply of <br /> safety and emergency equipment is available. <br /> n / <br /> Designated Site Safety Officers: Joseph Ramage 0 9 Date: ? (29( 91 <br /> The Site Safety Officer(SSO) is responsible for implementing the site health and safety plan. <br /> This includes ensuring that field personnel have read and signed the HSP, and that a Tailgate <br /> Safety Meeting is conducted on site each day prior to initiating field activities. In addition, the <br /> SSO will be responsible for auditing the site operations for compliance with the health and safety <br /> plan and any applicable federal, state or local requirements. The SSO is required to be on site at <br /> all times. In the SSO's absence, a designated alternate will assume the duties and <br /> responsibilities. <br /> Work Objectives/Scope: Conduct soil and groundwater investigation related to a former <br /> ,1 underground storage tank (UST). For this investigation, soil and groundwater grab samples will <br /> be collected from two (2) soil borings using a Geoprobe 5400 Direct Penetration Technology <br /> (DPT) rig. <br /> i <br /> 1 <br /> i <br /> i <br />