My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003254
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOUSTON
>
1740
>
3500 - Local Oversight Program
>
PR0545289
>
ARCHIVED REPORTS_XR0003254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 9:49:35 AM
Creation date
2/11/2020 8:42:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003254
RECORD_ID
PR0545289
PE
3528
FACILITY_ID
FA0003828
FACILITY_NAME
VAN BUSKIRK GOLF COURSE
STREET_NUMBER
1740
STREET_NAME
HOUSTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16307036
CURRENT_STATUS
02
SITE_LOCATION
1740 HOUSTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.14 September 1998 " <br /> AGE-NC Project No. 98-046$ <br /> If Page 9 of 10 . <br /> 4.4. WELL DEVELOPMENT <br /> Development will consist of a combination of bailing to remove the major portion of fine-grained <br /> sediment from inside thewell-, surging to flush out-or draw in sediment from the filter pack, and <br /> -additional bailing to finish the removal of sediment. Development activities will be continued until <br /> field parameter(pH, electrical conductivity, and temperature) readings have stabilized. <br /> 4:5. GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with pertinent applicable sampling <br /> protocols, details of'which are presented below. <br /> 4.5:1. Static Water Level Measurements <br /> .Before sampling and during quarterly groundwater monitoring, static water level will be measured <br /> using,an electric water level indicator. Water level data will be'recorded to'the nearest 0.01 foot <br /> from a reference point marked of the top of the PVC well casing. Before and.after each use, the <br /> measurement device will be rinsed 'with water. <br /> 4.5.2. Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling, the well.will be purged using. <br /> a disposable bailer to"-ensure.that the sample is representative of the formation, rather than water <br /> standing in the well casing. The well will be purged until: 1) a minimum of three casing volumes is <br /> removed from the well; and 2) the field-measured ground water parameters have -stabilized. <br /> However, a well is purged dry prior to evacuating three casing volumes, a ground water sample will <br /> ` be collected following 80 percent recovery of ground water within,the well or within 8-hours of well <br /> evacuation. <br /> 4.5..3. Sample Withdrawal , <br /> Water samples will be collected from the monitoring well using.a disposable polyethylene bailer. <br /> These bailers are disposed of after one use and require no decontaminating, therefore minimizing <br /> cross contamination due to sampling devices. Samples,will be.drawn and collected inksucli a manner <br /> that agitation and exposure of the groundwater to the atmosphere is minimal. Sample containers will <br /> be filled using the appropriate disposable sampling attachment which allows controlled flow out of <br /> Advanced GeoEovironm.entsl,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.