Laserfiche WebLink
_ � t <br /> September 4, 1997 <br /> f <br /> on the volume of neat cement used,we conclude that a`significant portion (and perhaps <br /> all)of the filter pack was successfully grouted. <br /> The well boxes for Wells VW-I through VW-6 were removed and capped with cement <br /> dyed black to match,the surrounding surface. Marvin Katz(Texaco) requested that I 1 <br /> previously drilled soil boring sites be cut-out and resurfaced as mentioned above. <br />,F Additionally, as requested by Texaco,the steel vapor line(approximately 4 feet long) <br /> :attached to Well VW,.-I (Figure I)I was completely removed from the site and the trench i <br /> was resurfaced to match existing grade.. <br /> Drilling, well box des truction,grouting,and discrete site resurfacing was performed by <br /> Mitchell Drilling,a state-licensed well driller, and observed by a PACIFIC geologist. <br /> :Please call our office at(9 16)85&23 50 if you have any questions or comments regarding <br /> this letter, and please send avopy of the closure letter by fax to Mr. Ron Zielinski of <br /> Texaco.at(510)237!:7821, <br /> i <br /> Sincerely; I <br /> cfic Environmental,Group, Inc <br /> l � <br /> i.. <br /> ;k <br /> Dennis M. Jones -— i <br /> Staff Geologist <br /> tBARCUY t <br /> N0.62M <br /> Greg Barclay <br /> Senior GeologistRG 6260' <br /> '( 1 <br /> Attachments: Figure 1 - Site Map, GEOCGN May 199.5. <br /> �I <br /> I <br /> I <br /> cc: Mr. Michael infink San Joaquin County Erivironme.a. . Health Division �{ <br /> 1VIr. lave Efenricll,Texaco;Refining& Marketing, lnc, + <br /> f <br /> 940001 t.,unaArao.i OC ; <br /> i; <br /> :I i� <br />