Project.No. 58080-06.02 <br /> September 30, 1994 <br /> Page,5, <br /> bottom of the screen interval to an elevation of two feet above the screen zone.. A <br /> two foot.thick seal consisting of hydrated bentonite chips will be placed above the <br /> filter pack. Above the seal a mixture of bentonite powder and cement will be placed <br /> 10 within two feet of grade level. A minimum 14-inch diameter, traffic-ranted security <br /> wellhead cover set in.A. ..concrete pad will be used to complete construction.. <br /> Task V Installation of Groundwater Monitoring Wells. <br /> Install:offsite groundwater monitoring wells 1'v W4 and NfUV=S in the adjacent public <br /> right-of-ways iatthe locat ons depicted on Figure 2. be wells will be installed to <br /> depths of 70 feet below the groundwater surface.- The monitoring wells will be <br /> constructed using 2-inch; diameter polyvinyl chlorid6 {P' � casing. T'he Lower <br /> porion of the:wells will be constructed using 20 feet of A020-inch.: slotted screen <br /> PVC casing. A filter pack Consisting of No lviontetey sand will be trimmed <br /> around the.screen from the:bottom of the boring to:an elevation of two:feet above <br /> the screen zone. A two foot thick seal consisting of hydrated bentonite chips will be; <br /> placed above the filter pack. Above the seal a mixture o€ bentonite powder and <br /> cement will be placed to within two 'feet of grade level, A minimum 14-inch. <br /> diameter, traffic-rated security wellhead cover set in a concrete pad will be used to - <br /> complete construction. <br /> • The top of casing elevations for the new groundwater monitoring wells will be <br /> surveyed relative to the designated temporary benchmark, <br /> Task VI - Groundwater Well Development Purgingand nd amplin <br /> • No Tess than 48 hours after the completion of well construction, develop the <br /> groundwater monitoring wells for approximately 10 minutes (or until turbidity <br /> stabilizes) utilizing a surge block,- <br /> No less than 48 hours after the completion of well development the depth-to- <br /> groundwater will be measured with a electronic water level meter: The water level <br /> meter will be cleaned with liquinox solution and triple rinsed prior to introduction <br /> intoa new well <br /> Tlyree to five borehole volumes of groundwater will be ;purged to allow fresh. <br /> format�vn water to infiltrate the wells. During purging, the pH temperature, and <br /> electrical conductivity of the groundwater will be measured. <br /> • Following purging; water will be collected from each well with a pre-cleaned <br /> disposable bailer. Th(i .collected water will be decanted into appropriate sampling <br /> Ontainers supplied 6y the analytical laboratory. Upon collection, the sampling <br /> containers will be sealed,labeled and placed into an ice-ch ;cooled with blue ice <br /> pending:delivery to the laboratory. Samples will be caillected and transported under <br /> standard chain-of-custody documentation: <br />