Laserfiche WebLink
Project No S8080-06-03 <br /> January 19, 1996 ¢ <br /> TABLE 11 <br /> SUMMARY OF GROUNDWATER ANALYTICAL DATA <br /> 305 SOUTH HUTCHINS STREET <br /> LODI, CALIFORNIA <br /> PAGE 1 OF 2 <br /> 1,2- 1,2- <br /> WELL/ Chloro- DichLoro Dichforo <br /> SAMPLE TPHg TPHd B T E X MTBE form -ethane TCE PCE -ethene <br /> NUMBER DATE (ug/L) (ug/1) (ug/1) (ug/0 (u9/1) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/0 Sampled by <br /> i <br /> MW 07/02/92 910 <50 6 8 2 8 5 1 29 NT <0 5 <0 5 <0 5 <0 5 <0 5 Uriah Inc <br /> MW-1 01/18/93 596 NT 1 26 5 31 1 91 4 97 550 6 0 7 01 <5 0 12 2 8 53 Uriah Inc <br /> MW-1 03/25/94 <1,000 NT <2 0 <2 0 <2 0 <2 0 560 0 5 86 2 15 <0 5 EPM Tech <br /> MW-1 07/01/94 <50 NT <0 5 <0 5 <0 5 <0 5 150 <1 0 <1 0 <1 0 12 <1 0 Geocon <br /> MW-1 11/30/94 <50 74 <0 5 <0 5 <0 5 <0 5 270 <0 5 22 0 82 13 <0 5 Geocon <br /> MW-1 06/30/93 200 120 7 7 22 5 5 27 340 <0 5 23 0 71 5 6 <0 5 Geocon <br /> MW-1 07/24/95 NT NT NT NT NT NT 300* NT NT NT NT NT Geocon <br /> MW-1 09/15/95 180 <50 25 54 3 6 14 470 <0 5 31 0 5 4 5 <0 5 Geocon <br /> MW-1 12/14/95 290 <50 50 74 4 3 24 700 NT NT NT NT NT Geocon <br /> MW-2 07/02/92 <50 <50 <0 5 <0 5 <0 5 <0 5 NT <0 5 <0 5 <0 5 <0 5 <0 5 Uriah Inc <br /> MW-2 01/18/93 319 NT 0 602 3 69 1 7 4 99 NT NT NT NT NT NT Uriah Inc <br /> MW-2 03/25/94 <1,000 NT <0 5 <0 5 <0 5 <0 5 <0 5 <0 5 4 <0 5 3 <0 5 EPM Tech <br /> MW-2 07/01/94 <50 NT <0 5 <0 5 <0 5 <0 5 2 1 <1 0 - 2 0 <1 0 2 0 <1 0 Geocon <br /> MW-2 11/30/94 <50 <50 <0 5 <0 5 <0 5 <0 5 <0 5 <0 5 1 1 <0 5 2 0 <0 5 Geocon <br /> MW-2 06/30/95 140 = 150 1 6 2 9 1 3 3 9 <5 0 <0 5 2 5 <0 5 2 4 <0 5 Geocon <br /> MW-2 07/24/95 NT NT NT NT NT NT <5 0* NT NT NT NT NT Geocon <br /> MW-2 09/14/95 570 <50 49 91 6 4 24 <5 0 <0 5 <0 5 2 9 1 0 <0 5 Geocon <br /> MW-2 12/14/95 660 <50 120 100 6 7 30 <5 0 NT NT NT NT NT Geocon <br /> MW-3 07/02/92 780 <50 8 2 3 5 6 6 19 NT <0 5 <0 5 <0 5 <0 5 <0 5 Uriah Inc <br /> MW-3 01/18/93 148 NT <0 5 <0 5 <0 5 l 043 NT NT _ NT NT NT NT Uriah Inc <br /> MW-3 03/25/94 <1,000 NT <1 0 <1 0 <1 0 <1 0 200 <0 5 32 0 9 2 <0 5 EPM Tech <br /> MW-3 07/01/94 64 - NT <0 5 <0 5 <0 5 0 8 120 <1 0 <1 0 <1 0 1 9 <1 0 Geocon <br /> MW-3 11/30/94 250 190 <0 5 <0 5 0 75 <0 5 76 <0 5 12 2 2 5 2 <0 5 Geocon <br /> MW-3 06/30/95 870 1,200 6 4 8 7 29 13 65 <0 5 8 7 4 9 11 1 0 Geocon <br /> MW-3 07/24/95 NT NT NT NT NT NT 88* NT NT NT NT NT Geocon <br /> MW-3 09/14/95 600 <50 51 240 5 0 23 35 <0 5 5 5 2 6 6 0 1 1 Geocon <br /> MW-3 12/14/95 530 <50 29 33 2 4 14 35 NT NT NT NT NT Geocon <br /> MW-4 11/30/94 <50 52 <0 5 <0 5 <0 5 <0 5 <0 5 <0 5 <0 5 <0 5 1 1 <0 5 Geocon <br /> MW-4 06/30/95 <50 140 2 0 3 9 0 92 4 1 <5 0 <0 5 <0 5 <0 5 2 2 <0 5 Geocon <br /> MW-4 07/24/95 NT NT NT NT NT NT <5 0* NT NT NT NT NT Geocon <br />