Laserfiche WebLink
Updated:114101 LREMEDIAL OVERSIGHT PROGRAM Report#: 7540 <br /> Printed: 1!4!01 SITE DATA Page#: 1 <br /> Remedial Oversight Record OZ00000623 Facility ID: FA0007767 Site Code: 1507797 RWQCB Site ID: <br /> ocl <br /> Site Name: WILBUR ELLIS COI H&H ENGNRNG Substance: 8006619 Petroleum: y <br /> Site Contact: JAN THOMPSON District: 002-MARENGO,DARIO <br /> Site Address: 212 INDUSTRIAL OR Location Code: 01 -STOCKTON <br /> STOCKTON CA 95206 <br /> Phone: 209-983-0708 Fax: Email: <br /> Case Type: A-Aquifier polluted APN: Reported: 3117198 <br /> Fund Source: F-Federal <br /> Confirmed: 413198 <br /> Assigned to: EE0000684-INFURNA Latitude: X-Coordinate: X Coordinate-177 <br /> Current Status: Longitude: <br /> Y-Coordinate: Emergency Response: <br /> Datm&Info <br /> RP Search:S-Solvent RP Search Started: 117198 RP Search Ended: 118198 <br /> Preliminary Assessment:U-Underway Preliminary Assessment Started:1114/98 Preliminary Assessment Ended: <br /> Remediation Investigation: Remediation Investigation Started: Remediation Investigation Ended: <br /> Remedial Action: Remedial Action Started: Remedial Action Ended: <br /> Post Remediation Monitoring: Post Remediation Monitoring Started: Post Remediation Monitoring Ended: <br /> Case Closed: Case Closed Date: <br /> Contaminated Soil left in Place: <br /> Remedial Action Taken 41: Enforcement Type: 1 -NOR ISSUED <br /> Remedial Action Taken#2: Enforcement Action Taken: N Enforcement Action: <br /> Remedial Action Taken#3: <br /> Remedial Action Taken#4: Contract Status: 5 <br /> Remedial Action Taken#5: Federal Exempt: N <br /> Remedial Action Taken#6: Case List: <br /> Remedial Action Taken#7: LUFT Considerations: <br /> _.. <br /> encies <br /> Interim Remediation: N Interim Remediation Date: <br /> LUSTIS Update: Last Technical Correspondence: 10/6100 <br /> Review Status: Priority: EBUA Category: <br /> Lead Agency: L-Local Agency .LOP Site(Pilot Program): Y❑ <br /> Emergency Response?: N State OES Report Filed?: N <br /> Discovery Date: How Discovered: How Stopped: <br /> Leak Started: Leak Stop Date: Primary: <br /> Leak Source: Leak Cause: Secondary: <br /> Excavation Started: Tertiary: <br /> eased Substan : _.. . <br /> Monitoring Wells: 3 Free Product: Dissolved Constituent: TPHG <br /> Maximum Concentrations Current Concentrations '�.��(0? C?•'r"G0� <br /> TPH-Soil: 260 ppm Depth to GW: 39r# <br /> TPH-GW: 28,000 ppb TPH-GW: 2000+ppb <br /> Benzene-Soil: 6.8 ppm <br /> Benzene-GW: 10,000 ppb Benzene-GW: 1,#00ppb <br /> MTBE-Soil: .250 ppm <br /> MTBE-GW: <5.0 ppb MTBE-GW: <5.0 ppb <br /> Maximum MTBE Date: 12/29/99 <br /> Program Element Code: 3526-LOP GW SITE <br /> RespondWe Parties <br /> Responsible Party Record ID:RP0000398 Responsible Party#: 1 <br /> Responsible Party Name: WILBUR ELLIS CO 1 H&H ENGNRG <br /> Responsible Party Address: 191 W.SHAW AVE STE 107 <br /> FRESNO CA 93704-2876 tesponsible Party Phone: 559-226-1934 <br /> Responsible Party Company: JAN THOMPSON <br />