My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
212
>
3500 - Local Oversight Program
>
PR0545309
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:55:29 PM
Creation date
2/11/2020 9:10:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545309
PE
3528
FACILITY_ID
FA0010339
FACILITY_NAME
H&H ENGINEERING CONST INC
STREET_NUMBER
212
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3920
APN
17728019
CURRENT_STATUS
02
SITE_LOCATION
212 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wilbur-Ellis Company -2- April 16. 1999 <br /> Task Amount Pre-Approved Comments <br /> Anal}rtical-EPA 8015/8020 900 $225 per event(S75/sample) <br /> Anal}rtical-EPA 8260 375 3 samples @ $125 (last quarter only) <br /> TOTAL PRE-APPROVED S6,913 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary,then you must obtain three bids and request <br /> pre-approval of costs on the new scope of work. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request_Instructions (sent to you once you receive a LOC)to confirm that <br /> the costs are consistent with this pre-approval before you will be reimbursed. Please insure that <br /> your consultant prepares their invoices to include the required break down of costs on a time <br /> and materials basis, that invoiced tasks are consistent with the original proposal, and that <br /> reasonable explanations are provided far any changes made in the scope of work or increases <br /> in the costs. When the invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> I <br /> • technical reports, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions;, I can be reached at (916) 227-0747. <br /> Sincerely, <br /> Linda Sanborn, Associate Governmental Program Analyst <br /> Technical Review Unit,UST Cleanup Fund <br /> Enclosure <br /> cc: Margaret Lagoriol <br /> San Joaquin County EHD <br /> P_O. Box 2009 <br /> Stockton, CA 95201 <br /> F <br /> r <br /> California Environmental Protection Agency <br />
The URL can be used to link to this page
Your browser does not support the video tag.