My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
212
>
3500 - Local Oversight Program
>
PR0545309
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:55:29 PM
Creation date
2/11/2020 9:10:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545309
PE
3528
FACILITY_ID
FA0010339
FACILITY_NAME
H&H ENGINEERING CONST INC
STREET_NUMBER
212
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3920
APN
17728019
CURRENT_STATUS
02
SITE_LOCATION
212 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Wilbur Ellis / H & H Construction page 2 <br /> 212 Industrial Blvd., Stockton. <br /> In addition to the laboratory analyses your consultant has proposed, PHS-EHD <br /> will select the soil samples to be analyzed by EPA Method 8260 for all of the <br /> seven oxygenates noted in the enclosed policy. After the monitoring wells are <br /> installed and developed, the groundwater samples are to be analyzed for all of <br /> the oxygenates by 8260. <br /> Only neat cement(Type II-Portland), or cement with 3%-5% NSF labeled <br /> bentonite by weight, or an approved bentonite slurry can be used to grout <br /> monitoring wells. The ratio of potable water to cement is 'regulated. A ninety- <br /> four pound (94#) bag of cement to five gallons minimum and ten gallons <br /> maximum is the only acceptable ratio. Cement grout should be tremie-pipe <br /> installed from the bentonite up to the surface. <br /> An addendum is required that addresses the above noted concerns. PHS-EHD <br /> hereby modifies the drilling date from June 30, 1998 to July 10, 1998. The <br /> results of the "Phase One" should be submitted to PHS-EHD by August 10, <br /> 1998. PHS-EHD will review the report and comment on the proposed locations <br /> of the monitoring wells. The wells should be placed before August 31, 1998 and <br /> the final report of findings is due before October 1, 1998. <br /> Piease continue to submit your correspondence to Michael Infurna, Senior <br /> REHS, and you may call him at (209) 468-3454 should you have any questions <br /> or wish to discuss the site. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division , <br /> Michael J. Infurna Jr., Senior RENS Margar Lagorio, RE S <br /> LOP / Site Mitigation Unit IV Supervisor <br /> MI/ <br /> enclosure <br /> c: Krazan & Assoc. - Bruce J. Meyers, RG, 215 W. Dakota, Clovis, 93612 <br /> c: CVRWQCB - Mark List <br /> i <br /> z <br /> i <br /> 3 1 <br /> 3 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.