Laserfiche WebLink
cROJECT: H&H Engineering Proper nitoring Well No. MW-1 <br /> f 212 Industrial Drive, St on, California <br /> Project No. 034-98081 <br /> DATE DRILLED: TYPE OF BORING: <br /> Sept. 23, 1998 4-114" I.D, Hollow Stem Auger <br /> ? .LUNG EQUIPMENT: ELEVATION & DATUM: LOGGED BY: <br /> Mobile 861 HDX C. Pyatt <br /> ;AMPLING METHOD: DEPTH TO WATER: FIRST: COMPL.: 24 HRS: <br /> j : <br /> 2" Modified California Split Spoon 33.8 <br /> LE <br /> - L o ` <br /> :Elevation o o a U <br /> WELL <br /> ° - SOIL DESCRIPTION CONSTRUCTION <br /> Depth lFtl 0 ti cn <br /> Silty CLAY (CL); light yellow-brown, high plasticity, drills ' <br /> �._. firm. - <br /> 40 <br /> 45 <br /> •r h <br /> 50 <br /> pp -1 <br /> l <br /> BOTTOM OF BORING <br /> - I <br /> • l <br /> 60 <br /> f <br /> 1- I <br /> i <br /> 65 <br /> 70 <br /> f <br /> i <br /> j. . <br /> `R-Refusal, greater than 100 blowslfoot KRAZAN & ASSOCIATES, INC. Sheet 2 of 2 <br />