Laserfiche WebLink
ROJECT: H&H Engineering Pro <br /> onitoring Well No. AAW-2212 Industrial Drive, S- ton, <br /> California <br /> Project No. 034-98081 I <br /> DATE DRILLED: TYPE OF BORING: <br /> Sept. 23 & 24, 1998 4-114" I.D. Hollow Stem Auger <br /> `-!LLING EQUIPMENT: ELEVATION & DATUM: LOGGED BY: <br /> _.J Mobile B61 HDX C. Pyati <br /> i..iAMPLING METHOD: DEPTH TO WATER: FIRST: COMPL.: 24 HRS: <br /> 2" Modified California Split:Spoon 33.5 <br /> LEL <br /> m a <br /> S] W C J r <br /> I Elevation <br /> WELL <br /> L" - <br /> Depth/Fr) O <br /> OIL DESCRIPTIONCONSTRUCTIONC13 U <br /> I <br /> o � ` <br /> Silty CLAY {CH); light yellow-brown, saturated, high <br /> I, plasticity, drills firm. _ •'•l <br /> 40 <br /> 45 . .E <br /> soi <br /> BOTTOM OF BORING <br /> i <br /> �� 55 <br /> 60 I <br /> i <br /> fi5 <br /> i <br /> 70 <br /> *R=Refusal, greater than 100 blows/foot KRAZAN & ASSOCIATES, INC. Sheet 2 of 2 <br />