Laserfiche WebLink
-PROJECT. H&H Engineering Prop,,,', " <br /> Aonitoring Well No. MW-3 <br /> 212 Industrial Drive, S%!odkton, California <br /> - <br /> Project No. 034-98081 <br /> DATE DRILLED: TYPE OF BORING: <br /> t .. Sept. 24, 1998 4-114° I.D. Hollow Stem Auger <br /> `ILLING EQUIPMENT, ELEVATION & DATUM: LOGGED BY: <br /> Mobile B61 IDX C. Pyatt <br /> 3AMPI (NG METHOD: DEPTH TC WATER: FIRST: COMPL.: 24 HRS: <br /> 2" Modified California) Split Spoon 33.4 <br /> LI <br /> l EL F <br /> C <br /> Elevation 7 a m <br /> Depth lFrl o a M v a �U SOIL DESCRIPTION WELL <br /> _co CONSTRUCTION <br /> m <br /> 4b <br /> 45 <br /> 50 <br /> BOTTOM OF BORING <br /> i <br /> 55 . <br /> ff _ <br /> 50 � <br /> �i <br /> i <br /> &5 <br /> 70 <br /> i <br /> R=Refusal, greater than 100 blows/foot KRAZAN & ASSOCIATES, INC. Sheet 2 of 2 <br />