Laserfiche WebLink
A-3.2 Monitoring Well Development <br /> The wells are developed to reduce the effects of drilling on the formation and to increase the <br /> effective hydraulic radius of the wells <br /> ' Monitoring wells are generally developed 24 to 48 hours after installation to allow the grout to <br /> set Each well is first sampled with a clear disposable bailer to visually inspect for a hydrocarbon <br /> layer or sheen If no product layer or sheen is observed on the water, the well is developed by <br /> surging, pumping or bailing Surging along the screened interval of the well is performed to <br /> draw the sediment from the formation into the filter pack and the well, and to set the sand pack <br /> Development continues until the discharge runs relatively clear of fines Approximately 5 to 10 <br />' well volumes are generally removed from each monitoring well Discharge water is stored in 55- <br /> gallon drums and left on site for later discharge or disposal by the client, depending on laboratory <br />' results The drums are labeled with the date, well number, and a contact person and phone <br /> number <br />' A-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is washed <br />' in a trisodium phosphate or non-phosphate detergent solution and rinsed in distilled water or <br /> steam cleaned prior to use in the next monitoring well <br /> A-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the PVC <br />' casings are usually surveyed and tied into permanent markers, if readily available Survey <br /> accuracy is 0 1 foot for the "x" and "y" coordinates and 01 foot for the 'Y' coordinate The <br /> depth to static groundwater is measured from a set location at the top of the PVC casing (usually <br />' the north nm) The depth of water is then subtracted from the elevation of the top of the well <br /> casing to provide a groundwater elevation for each monitoring well location <br />' A-4 GROUNDWATER MONITORING <br /> A-4.1 Water Level Measurements <br />' Water level measurements are made in the wells prior to purging and sampling the wells <br /> Measurement protocol is as follows <br />' i Prior to obtaining water level measurements, the monitoring wells would be opened and <br /> allowed to equilibrate for a period of approximately'/2 hour <br /> 2 The water level probe is decontaminated in a trisodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse, prior to use in each well <br /> 20-4439-01 E01/2000R726 Page A-5 <br /> Copyright 2000 Klemfelder Inc August t8 2000 <br />