Laserfiche WebLink
ROJECT H&H Engineering Property Monitoring Well No MW-1 <br /> 212 Industrial Drive, Stockton, California <br /> Project No 034-98081 <br /> DATE DRILLED TYPE OF BORING <br /> Sept 23, 1998 4-114" 1 D Hollow Stem Auger <br /> 6, LING EQUIPMENT ELEVATION & DATUM LOGGED BY <br /> Mobile B61 HDX C Pyatt <br /> AMPLING METHOD DEPTH TO WATER FIRST COMPL 24 HRS <br /> 2" Modified California Split Spoon 338 <br /> a LEL <br /> C, o <br /> Flevarion 0 �p a o v a u <br /> Oeprh (Fr) o a h v a cn SOIL DESCRIPTION WELL <br /> ?v, W CONSTRUCTION <br /> m U <br /> Silty CLAY (CL), light yellow-brown, high plasticity, drills <br /> firm <br /> 40 <br /> 45 <br /> i <br /> 50 <br /> BOTTOM OF BORING <br /> 55 <br /> 60 <br /> 65 <br /> 70 <br /> R=Refusal, greater than 100 blows/foot KRAZAN & ASSOCIATES, INC Sheet 2 of 2 <br /> I <br />