Laserfiche WebLink
ROJECT H&H Engineering Property Monitoring Well No MW-2 <br /> 212 Industrial Drive, Stockton, California <br /> f <br /> DATE DRILLED TYPE OF BORING Project No 034-98081 <br /> Sept 23 & 24, 1998 4-114" f D Hollow Stem Auger <br /> LING EQUIPMENT ELEVATION & DATUM LOGGED BY <br /> Mobile 661 HDX C Pyatt <br /> AMPLING METHOD DEPTH TO WATER FIRST COMPL 24 HRS <br /> 2" Modified California Split Spoon 33 5 <br /> � LES � c <br /> , c o <br /> � � <br /> Elevationo C. <br /> epth (Ft) o a N c� 4°y SOIL DESCRIPTION WELL <br /> to m o c3 m CONSTRUCTION <br /> U <br /> Silty CLAY (CH), light yellow-brown, saturated, high <br /> plasticity, drills firm <br /> 40 <br /> 45 <br /> 50 <br /> BOTTOM OF BORING <br /> 65 <br /> 60 <br /> fi5 <br /> 70 <br /> R=Refusal greater than 100 blows/foot KRAZAN & ASSOCIATES, INC Sheet 2 of 2 <br />