Laserfiche WebLink
GROUND ZERO ANALYSIS LOG OF BORING SBo <br />' PROJECT WILBUR ELLIS LOCATION 212 INDUSTRIAL DRIVE, STOCKTOhPROJECT NO 594 <br /> DATE DRILLED 3/2/05 _.. LOGGED BY JOE VASQUEZ <br /> REVIEWED BY^ GREG STAHL ., <br /> DRILLING COMPANY FISCH ENVIRONMENTAL DRILLER RICK BERTOLINO METHOD DIRECT PUSH <br />' BORE HOLE DIAMETER 1 1/4 IN_ DEPTH DRILLED 50 FT DEPTH TO WATER INITIAL NM FT STATIC NM ET <br /> CASING TYPE NA DIAMETER _ IN SCHEDULE INTERVAL FT TO ET <br /> 0CREEN TYPE NA DIAMETER IN SLOT SIZE IN INTERVAL FT TO _- FL <br /> LTER PACK TYPE NA INTERVAL FT TO - FT <br />' SURFACE SEAL TYPE NEAT CEMENT INTERVAL 0 FT TO -- 50 FT <br /> COMMEN'T'S WATER SAMPLE COLLECTED FROM TEMPORARY WELL CASING PAGE OF-!-- <br /> WELL <br /> F 2WELL DEPTH P[D SAMPLE ID U S C DESCRIPTION <br />' DETAIL FT PPM BLOWCOUNT LOG <br />' 2 x <br /> 4 <br />' 6 <br /> 1 $ <br />' —10- <br /> 12 <br /> a 14 <br /> U <br /> � 16 <br /> It"mis <br /> NO SOIL SAMPLES COLLECTED SOIL TOO SATURATED FROM RAINFALL18 PUSHED BORING DIRECTLY TO 50 FEET TO AVOID CROSS CONTAMINATION <br /> 20 <br />' 22 <br />' -24— <br /> '26- <br /> -28 <br /> 24 2628 <br />' 30 <br />' 32 <br />' 34- <br /> -36 <br /> I <br /> 38 <br /> 40 <br />