Laserfiche WebLink
ROJECT H&H Engineering Property Boring No B-5 <br /> 212 Industrial Drive, Stockton, California <br /> Project No 034-98081 <br /> DATE DRILLED TYPE OF BORING <br /> August 13, 1998 3-114" 1 D Hallow Stem Auger <br /> ,,BILLING EQUIPMENT ELEVATION & DATUM LOGGED BY <br /> s1W Mobile B61 HDX C Pyatt <br /> AMPLING METHOD DEPTH TO WATER FIRST COMPL 24 NRS <br /> 2" split spoon with brass sleeves <br /> I <br /> C a o <br /> Elevation `ocu <br /> p y a ° V — 2 <br /> Depth iFt) o � � E " �,N SOIL DESCRIPTION <br /> cN <br /> s <br /> 40 <br /> increase in moisture <br /> BOTTOM OF BORING <br /> 45 <br /> 50 <br /> 55 <br />' 50 <br /> f <br /> f i <br /> i <br /> I <br /> I ss <br /> i <br /> I <br /> 70 <br /> I <br /> 10— <br /> I <br /> 75 <br /> 3 <br /> I <br /> i <br /> k <br /> O=Refusal, greater than 100 blows foot KRAZAN & ASSOCIATES, INC Sheet 2 of 2 <br />