Laserfiche WebLink
GROUND ZERO ANALYSIS LOG OF BORING sec <br /> PROJECT ' WILBUR ELLIS LOCATION 212 INDUSTRIAL DRIVE, STOCKTON PROJECT N0. S94 <br /> DATE DRILLED ___-3/2/05 _ LOGGED BY JOE VAS UEZ REVIEWED BY GREG-STAHL <br /> DRILLING COMPANY FISCH ENVIRONMENTAL DRILLER RICK BERTOLINO METHOD DIRECT PUSH <br /> BORE HOLE DIAMETER -1 1/4 IN DEPTH DRILLED 50 FT DEPTH TO WATER INITIAL 50 FT STATIC NM FT <br /> ASING TYPE N/A.,_— DIAMETER IN SCHEDULE INTERVAL FT TO _ FT <br /> OCREEN <br /> TYPE –_ N/A DIAMETER IN SLOT SIZE IN INTERVAL FT TO - FT <br /> FILTER PACK TYPE INTERVAL FT TO - FT_ <br /> SURFACE SEAL TYPE NEAT CEMENT INTERVAL 0 FT_ TO 50 FT <br /> COMMENTS HYDROPUNCH SAMPLE ATTEMPT FAILED WATER SAMPLE COLLECTED FROM TEMPORARY WELL CASING PAGE 1 OF__L_ <br /> WELL DEPTH PID SAMPLE D U S C DESCRIPTION <br /> DETAIL FT PPM SLOWCOUNT LOG <br /> 0-12 CLAY WITH SILT (ML/CL), 5% SND, 95% FNS, L DRY STRGTH, L TGHN£SS, <br /> L PLAST, LT BRN, NO ODOR, MST-WET <br /> 2 <br /> 4 <br /> B ML/CL <br /> 8 <br /> 10 <br /> i <br /> 12— F <br /> SOIL SATURATED FROM RAINFALL HOLE FILLING WITH WATER TO AVOID CROSS <br /> i CONTAMINATION BORING WAS PUSHED DIRECTLY TO 50 FEET <br /> Q 14 <br /> v <br /> 16 <br /> r <br /> lit <br /> m <br /> a i8 <br /> 20- <br /> -22- <br /> 24- <br /> 26- <br /> -28- <br /> -30- <br /> -32- <br /> 34— <br /> _36— <br /> _38- <br /> 40 <br /> 022242628303234363840 <br />