My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011716
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
6540
>
2900 - Site Mitigation Program
>
PR0545317
>
ARCHIVED REPORTS_XR0011716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:30:00 PM
Creation date
2/11/2020 9:32:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011716
RECORD_ID
PR0545317
PE
2952
FACILITY_ID
FA0005251
FACILITY_NAME
M L GRENZ
STREET_NUMBER
6540
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00526003
CURRENT_STATUS
02
SITE_LOCATION
6540 E JAHANT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A) Total Organic Vapors <br /> A direct reacting photoionization detection (PID) meter (HNU PI 101 <br /> or equivalent) will be used to monitor the concentrations of organic <br /> vapors in the Oork area. Measurements will be taker} at least once <br /> every 15 minutes during surface and subsurface sample collection. <br /> Ilre meter will be calibrated for benzene. Total organic vapor <br /> measurements will be used to determine the appropriate levels of <br /> respiratory protection and conditions for site evacuation. Total <br /> organic vapor concentrations in the workers breathing zone in excess <br /> of 10 Pprn above backgr(nind will trigger art upgrade from level D to <br /> level C protection. Breathing zone cor►centrations in excess of 250 <br /> ppm will stop the work on--site until the work zone concentrations are <br /> reduced to below 250 ppw. <br /> EMPLOYEE rRAINING AND INFORMAFION <br /> All perscmnel workir►g have completed the certified 40 hour Osha hazardous <br /> waste training course, and have beer► trained in the following objectives: <br /> o Workers are aware of potential hazards they <br /> may encotn►t,er. <br /> a Knowledge and skills necessary to perform the <br /> work with minimal risk to works health and safety. <br /> o Fa►nf lfarizatlon with the Site Safety pian and <br /> site-specs f is requirements. <br /> The training plan for this site eneanpasses: <br /> o Potential physical and chemical health hazards. <br /> o Respiratory protection, rationale, use, maintenance <br /> and fit testing. <br /> o Protective clothing, use and maintenance. <br /> o Entry, exit and decontamination procedures. <br /> o Documentation and record keeping procedures, <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.