My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
3500 - Local Oversight Program
>
PR0545313
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:54:03 AM
Creation date
2/11/2020 9:36:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545313
PE
3528
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
02
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Tim Smith <br /> County of Los Angeles <br /> Department of Public Works <br /> October 19, 2009 <br /> Page 4 <br /> using the EPA Method 8025 (modified for diesel range organics) and for fuel oxygenates, including <br /> BTEX,MTBE,DIPE, ETBE,TAME and TBA using the EPA Method 8260B. <br /> If ground water samples are collected, they will be analyzed for the samearameters as the soil } <br /> p � F � <br /> samples. <br /> All laboratory analyses will be performed using standard turnaround time. 5� <br /> Borin.g Abandonment and Investi tion-Derived Waste Management <br /> Following completion of soil sampling, the borings will be backfilled using a bentonite slurry <br /> mixture, or other state-approved material, followed by a concrete cap. �- <br /> Drill cuttings will be containerized in DOT-approved 55-gallon drums and temporarily stored 4° <br /> onsite. Following evaluation of laboratory analytical data, the waste will be disposed of in <br /> accordance with applicable regulations. <br /> Health and Safety <br /> Prior to implementing this work plan, a field health and safety plan (HSP) will be prepared. The <br /> HSP will include: <br /> * Potential physical hazards, <br /> • Potential chemical .hazards, including exposure limits and onsite ,monitoring (if any) and <br /> required safety and personnel protective equipment, <br /> • Personnel training,. <br /> + Emergency information, such as nearest hospital and emergency phone numbers. <br /> A copy of the HSP will be maintained onsite throughout field operations. <br /> SCHEDULE <br /> Contingent upon the availability of drilling contractors,it is anticipated that the field work can begin <br /> within approximately four weeks after approval of this work plan. Field activities will require <br /> approximately one day to complete. A results report will be submitted within four weeks from the <br /> receipt of laboratory analytical results. <br /> j <br />
The URL can be used to link to this page
Your browser does not support the video tag.