My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
13475
>
3500 - Local Oversight Program
>
PR0545314
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:29:58 PM
Creation date
2/11/2020 9:42:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545314
PE
3528
FACILITY_ID
FA0005333
FACILITY_NAME
JACKPOT
STREET_NUMBER
13475
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
LODI
Zip
95240
APN
06326004
CURRENT_STATUS
02
SITE_LOCATION
13475 N JACK TONE RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> i <br /> Time Oil Company -2- June 19, 1998 <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and ' <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to <br /> undertake interim remedial action after: (1)notifying the regulatory agency of the proposed action, and; <br /> (2) complying with any requirements that the regulatory agency may set. Interim remedial action should <br /> ; .,....�....w. <br /> only_be proposed when.necessary,to_mitigate_an-i=ediate.demonstrated-hazaT.d.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost PreQ12roval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing, you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids and cost preapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> 91 <br /> If you have any questions,please contact me at(916) 227-2784. <br /> Sincerely, <br /> �lN <br /> Pamela Rarick <br /> Claim Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> 'cc: 'Mr.-Gordon Boggs •-` �.- Ms Margaret Lagorio-- >� �• = --- . <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> California Environmental Protection Agency <br /> �d Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.