My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
1702
>
3500 - Local Oversight Program
>
PR0545315
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 12:05:30 PM
Creation date
2/11/2020 9:46:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545315
PE
3528
FACILITY_ID
FA0003572
FACILITY_NAME
DAVES UNION SERVICE
STREET_NUMBER
1702
STREET_NAME
JACKSON
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
227-14-011
CURRENT_STATUS
02
SITE_LOCATION
1702 JACKSON ST
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWATER <br /> G R o U r, I N c. <br /> SOIL VAPOR EXTRACTION TEST PROTOCOLS <br /> PURPOSE AND SCOPE <br /> The purpose of the soil vapor extraction test is to evaluate the feasibility of <br /> contaminant volatilization in the vadose zone as a remedial option at the site, and <br /> determine the number of vapor extraction wells necessary. In particular, the <br /> objectives of the test are to: <br /> • Determine the effective radius of influence of a single well, <br /> • Determine the optimal vacuum and flow rates for a single well to obtain a <br /> significant radius of influence, and minimize the number of required wells, <br /> • Determine the air permeability of the vadose zone to evaluate the feasibility.of <br /> volatilization for the given contaminant at the site, <br /> • Determine the number of required wells to remediate the site through <br /> volatilization in a reasonable period of time (<5 years). <br /> FIELD PROCEDURES AND EQUIPMENT <br /> Soil Vapor Extraction Test Procedures <br /> One to several different vapor wells or suitable monitoring wells are subjected to <br /> the vapor extraction test. A monitoring well may be considered suitable for a vapor <br /> extraction test if at least five feet of well screen is exposed above the water table. A <br /> vacuum source is attached to a given test well. The soil vapor extraction test is <br /> conducted in several steps on the test well. An initial step is conducted at a low <br /> vacuum and flow rate. Subsequent steps consist of increasingly higher vacuum and <br /> flow rates until a maximum vacuum and flow rate is reached, as determined by <br /> equipment limitations or site geology. During the test, vacuum is measured in <br /> surrounding monitoring points. Monitoring points may be other vapor wells, <br /> vapor points or suitable monitoring wells. Each step of the vapor extraction test is <br /> concluded on a test well when consecutive vacuum measurements from <br /> monitoring points differ by less than 0.1 inch water column within one-half to one <br /> hour. Ln-fluent air samples, and if required by the local air quality authority effluent <br /> air samples, will be collected for appropriate analyses by a State-certified <br /> environmental. laboratory. The following data are collected during the pilot test: <br /> Soil Vapor Extraction Test Protocols Page 1 or 5 October =, I994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.