My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
1702
>
3500 - Local Oversight Program
>
PR0545315
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 12:05:30 PM
Creation date
2/11/2020 9:46:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545315
PE
3528
FACILITY_ID
FA0003572
FACILITY_NAME
DAVES UNION SERVICE
STREET_NUMBER
1702
STREET_NAME
JACKSON
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
227-14-011
CURRENT_STATUS
02
SITE_LOCATION
1702 JACKSON ST
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWATER <br /> G R O U l?, I N C. AL 10 1995 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Ms. Linda A. Turkatte;Senior R.E.H.S. June 30, 1995 <br /> San Joaquin County Public Health Services <br /> Environmental Health Department <br /> P.O. Box 388 <br /> Stockton, California 95201-0388 <br /> Re: Ekholm Property, 1702 Jackson Street, Escalon CA <br /> Dear Ms. Turkatte, <br /> In a letter mailed June 14, 1995, the San Joaquin County Public Health <br /> Services, Environmental Health Division (PHS/EHD) presented several <br /> questions regarding the soil vapor extraction (SVE) system at the subject <br /> location. The letter was addressed to Mr. John Lane of Smith Environmental, <br /> with a carbon copy directed to Clearwater Group Inc. (Clearwater). Clearwater <br /> is currently responsible for operating and maintaining the SVE system. <br /> For clarity, our responses correspond to numbered paragraphs in your letter <br /> (see attachment). <br /> Paragraph 2: <br /> The SVE system as-built (Figure 5 in the Quarterly Monitoring Report dated <br /> May 14, 1995) has been updated to reflect the piping configuration and <br /> monitoring ports in the system. A schematic diagram of the system is also <br /> attached, per your request. <br /> Paragraph 3: <br /> Clearwater removed the carbon from the system on March 16, 1995 and left <br /> the system shut down until March 22. On March 22, wells VW-1, VW-2, and <br /> VW-3 were connected to the system at the request of PHS/EHD. The system <br /> was started up long enough to test each well individually and to sample <br /> effluent (Table 2.) <br /> 1125 Atlantic Avenue•Suite 102•Alameda•California•94501 •(510)337-8730•Fax(510)523-0984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.