Laserfiche WebLink
PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> JOGI KHANNA M.D.,M,P.H <br /> Health Officer <br /> P_O. Box 2009 • (1601 East Hazelton Avenuc) •Stockton, California 95201 enc!F o* <br /> (209)46&3400:' <br /> MARGARET EKHOLM1 <br /> P O BOX 247 APR 19 1993 <br /> ESCALON CA 95320 CC.00Y <br /> RE: Ekholm Property SITE CODE: 1955 <br /> 1702 Jackson Street <br />[° Escalon, Ca <br /> San Joaquin County Public Health Services, Environmental Health <br /> r Division has completed the review of the "Summary of Phase I Soil <br /> Investigation/Workplan for Additional Soil/Groundwater <br /> Investigation Assessment" dated February 17, 1993 ,, submitted by <br /> RESNA Industries, and has the following comments. <br /> The installation of the proposed three additional monitoring <br /> wells and the three vapor extraction test wells, as described in <br /> the workplan, can be scheduled to begin as soon as a permit for <br /> the drilling is secured from this office. Please submit a <br /> completed permit application. and the associated $89. 00 fee to <br /> this office by May 3, 1993. <br /> The use of the previously excavatedisoii from the former gasoline <br /> tank pit area to backfill the open excavation is acceptable at <br /> this time. The need to mitigate the residual levels of <br /> contamination noted in this soil will be determined upon the <br /> evaluation of the results of the investigation to be conducted on <br /> the soils underlying the former gasoline tanks. 1 <br /> The proposed over-excavation' of the:former diesel tank pit area <br /> and the former 'waste.-oil-tank`pit area- can"be scheduled to begin <br /> after the completion of the public participation period. PHS/EHD <br /> must conduct public participation for any corrective action <br /> proposed at underground storage tank sites pursuant to Section <br /> 2728, Chapter 16 of the California Code of Regulations. <br /> An "Executive Summary" will need tobe prepared and submitted to <br /> PHS/EHD prior to the initiation of the public participation <br /> period. The "Executive Summary" should be a brief one page <br /> explanation of the over-excavation remedial option chosen for <br /> these two former tank pit areas. The summary should be written <br /> so that it can be easily understoodby the general„public. <br /> PHS/EHD will initiate the public participation process upon ` <br /> receipt of the "Executive Summary".,. Please submit the requested � <br /> f <br /> Allivision of sen jo2qum(bunr% iiczwi i ;rr tiPrvices <br />