Laserfiche WebLink
If at any time laboratory analytical results or field monitoring readings show air emission limits <br /> to be exceeded, a confirmation air sample should be collected in accordance with APCD permit <br /> guidelines <br /> ' 11.0 SCHEDULE <br /> The estimated schedule for tasks discussed in this report are as follows <br /> ESTIMATED <br /> ' TASK COMPLETION DATE <br /> Submit CAP June 30, 1994 <br /> Distribute Request for Proposals July 15, 1994 <br /> ' Select Consultant September 1, 1994 <br /> Complete Design of Vapor Extraction System September 30, 1994 <br /> Submit Permit Applications October 15, 1994 <br /> ' Receive Authority to Construct from APCD December 31, 1994 <br /> Complete Installation of Vapor Extraction System February 15, 1995 <br /> ' Complete Source Test and Begin Operation March 30 1995 <br /> P , <br /> 1 <br /> 150047\REPORTWAP-0694 FNI- 19 <br />