My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003097
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
1702
>
3500 - Local Oversight Program
>
PR0545315
>
ARCHIVED REPORTS_XR0003097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 11:44:48 AM
Creation date
2/11/2020 9:52:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003097
RECORD_ID
PR0545315
PE
3528
FACILITY_ID
FA0003572
FACILITY_NAME
DAVES UNION SERVICE
STREET_NUMBER
1702
STREET_NAME
JACKSON
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
227-14-011
CURRENT_STATUS
02
SITE_LOCATION
1702 JACKSON ST
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESNA Industries Inc ����� <br /> Quality Assurance/Quality Control Plan <br /> Revised Novcmber 199'- <br /> Soil samples will be collected at 5-foot intervals, at significant changes in lithology and <br /> intervals of obvious contamination in order to develop a complete profile of soil <br /> contamination. <br /> 11.2 Sample Collection During Tank Removal <br /> Soil samples will be collected as soon as possible after removal of the tank. Where <br /> ' feasible, all preparations for soil sampling will be made prior to tank removal. Soil <br /> samples collected from a backhoe bucket or directly from the excavation floor will be <br /> collected in a thin-walled stainless steel or brass cylinder at least 3-inches long by 1-inch <br /> in diameter From 3 to 24-inches of soil will be removed from the immediate surface <br /> iarea where the sample is to be taken and the cylinder will then be pounded into the soil <br /> with a wooden mallet, bulk density driver, or other decontaminated dnving device. No <br /> headspace will be present in the cylinder once the sample is collected. Care will be <br /> taken to avoid contamination of both the inside and outside of the cylinder as well as its <br /> ' contents. During sampling, latex gloves will be worn to prevent cross-contamination <br /> ' with other samples. One pair of disposable gloves will be dedicated to each sample <br /> collected <br /> ' Once the sample is collected, each end of the cylinder will ill be sealed with aluminum foil <br /> ' or teflon tape and then capped with a polyethylene lid, taped, and labeled. The sample <br /> will then be individually sealed in a ziplock bag and immediately placed in an ice chest <br /> ' containing dry ice or frozen chemical ice for delivery to a state certified laboratory. <br /> Sample identification, storage and transportation will be conducted as outlined in the <br /> previous section. <br /> QAQcI092 Flet. 1 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.