Laserfiche WebLink
1 <br /> CLEARWATER <br /> C R O L1 R, 1 N C <br /> 1 <br /> • VW-5 sample (March f, 1995) <br />' • Influent sample (March 28, 1993 <br /> p ) <br />' 0 VW-2, VW-4 and VW-5 samples (July 11, 1995) <br /> 6.0 RECOMMENDATIONS <br />' Results of analysis of groundwater samples collected during this phase of activity are <br /> generally consistent with those of previous sampling events. The low <br /> concentrations of ethylbenzene, toluene and xylenes detected in the sample collected <br /> from MW-4 on March 22, 1995 were not confirmed during the sampling event <br /> 1 conducted on June 22, 1995 All groundwater samples collected during the second <br /> quarter of 1995 contained no detectable concentrations of petoleum hydrocarbons. <br /> 1 Clearwater will continue to conduct operation and maintenance of the soil vapor <br /> -extraction system Operation and maintenance visits to the site will be made on a <br /> M monthly basis Air samples will be taken periodically to maintain compliance with <br /> the SJVUAPCD air emissions limits and to monitor the effectiveness of the system <br /> i <br /> 1 <br /> 1 <br /> 1 - <br /> 1 <br /> 1 <br /> 1 <br /> D-102 1Q95 5 August 31,1995 <br /> 1 <br />