Laserfiche WebLink
f ' <br /> CLEARWA'TER <br /> do <br /> ', Confirmation Borin Locations <br /> Given the localized extent of subsurface contamination, it is possible to identify <br /> appropriate confirmation boring locations and sampling intervals Clearwater <br /> recommends the boring locations shown on the attached figure It is recommended <br /> that samples be collected every five feet beginning at ten feet below grade, finishing <br /> at fifty feet below grade Samples should be analyzed for concentrations of TPH as <br /> gasoline and BTEX <br /> I have also included the site Health and Safety Plan for the vapor well installation, <br /> as well as a permit for well installation with a check for $89 00 If you should have <br /> any questions regarding this workplan, please do not hesitate to call me on my direct <br /> line at 510-337-8731 We look forward to working with you on this project <br /> r <br /> Sincerely, <br /> CLEARWATER GROUP, INC <br /> Juniper M Neill ED G0,o�i� <br /> Project Manager <br /> A g g <br /> A CK <br /> �f #5807 <br /> Q <br /> Markus B Niebanck, R G 9TEOF CAI������ <br /> Operations Manager <br /> Enclosures <br /> cc Brooke K Birkie, Neumiller & Beardslee <br /> t <br /> r <br /> f <br />