Laserfiche WebLink
1.0 PURPOSE <br />• This Site SafetyP <br /> Plan (SSP) the basic safety guidelines and requirements for <br /> the above scope(s) of work at the above site (see Site Plan - Figure 2) This SSP addresses <br /> the expected potential hazards that may be encountered during this project <br /> The provisions set-forth in this SSP will apply to Clearwater Group, Inc (Clearwater) <br /> employees and any subcontractors working for Clearwater at the fob site All personnel <br /> working for Clearwater, including subcontractors, at the job site must read this SSP, and <br /> sign the attached Compliance Agreement (Appendix A) before entering the work area <br /> 2.0 FACILITY BACKGROUND <br /> 2.1 Site Layout and History (Site location is shown on Fig 1, site map on Fig 2) <br /> Previous Site Operations Gasoline S e ry. stat .From To <br /> From To <br /> Is site currently active? Yes No X <br /> Work surface is Asphaltx Concrete Gravel/Dirtx <br /> ASTs/USTs present? Yes Nox Location <br /> Number of USTs removedL_Location see Prey. Date removed Apr-ii 17 , 1991 <br /> Resna Reports <br /> 2.2 Soil Contamination <br /> Maximum benzene concentration in soil _�L._Q.Q5ppm-Location <br /> Maximum TPH concentration in soil _ 2900ppm Location Mw-1 <br /> 2.3 Ground Water Wells and Contamination <br /> Number of monitoring wells at the site 4 <br /> Maximum dissolved benzene concentration to date 0 . 5ppb Well <br /> Latest maximum dissolved benzene concentration o__5ppb Well <br /> 2.4 Remediation <br /> Previous remedial system operation NONE From To <br /> From-To <br /> Active remediation <br /> Number of SVE wells 3 _AS wells GWE wells <br /> Other (trenches, sumps, ) <br /> • Remediation equipment on site <br /> A-111 1 September 20,1994 <br />