My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003569
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
3500 - Local Oversight Program
>
PR0545335
>
ARCHIVED REPORTS_XR0003569
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:30:20 PM
Creation date
2/11/2020 11:20:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003569
RECORD_ID
PR0545335
PE
3528
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
02
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-3 <br /> Each sample container submitted for analysis had a label affixed to identify the job number, sample date, <br /> time of sample collection, and a sample number unique to that sample. Samples were analyzed by a <br /> California-certified Iaboratory. <br /> A chain-of-custody form was used to record possession of the sample from time of collection to its arrival <br /> at the laboratory. When the samples were shipped, the person in custody of them relinquished the <br /> samples by signing the chain-of-custody form and noting the time. The sample control officer at the <br /> laboratory verified sample integrity and confirmed that it was collected in the proper container, preserved <br /> correctly, and that there was an adequate volume for analysis. <br /> 6.0 SURVEYING <br /> The top of each new well riser was surveyed to allow correlation of the ground water levels at the site. <br /> The surveyed point on each well riser was marked to insure all future ground water level measurements <br /> are taken from the same location. All new elevations were surveyed relative to an existing well (MW-3) <br /> with an elevation of 48.73 feet, to the nearest 0.01-foot. <br /> LxPzs3.Tn <br />
The URL can be used to link to this page
Your browser does not support the video tag.