My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 8:09:10 PM
Creation date
2/11/2020 11:26:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s V <br /> Mr. Kyle Christie 2 27 March 1989 <br /> 2. Ve request -that soil samples be collected for laboratory analysis every <br /> 5-foot interval rather than every 101foot interval as proposed in the work <br /> plan. A soil sample is to be collected, using a 1 .5 foot-long split-spoon <br /> sampler, after each 5-foot-long continuous core sample has been collected. <br /> 3. Take portable vapor meter readings on the continuous core samples soon <br /> after they have been retrieved from the borehole and report the readings <br /> in the SRP. The information could be very useful when developing a soil <br /> remediation plan. <br /> 4. Provide trigometric calculated depths for each sample collected from the <br /> two slant borings. The drilling angles are to be reported and cross- <br /> sections are to be completed for both slant borings and included in the <br /> SRP. The crosssecti-ons -are-to -shop +heel-4.ca+ or,of the,-borehole,-sample:- <br /> points, <br /> he,_borehole,,—sample-points, dispenser islands and product pipelines, as well as the lithology <br /> and extent of contamination. <br /> Results of the soil characterization work are to . be presented in a SRP as <br /> outlined in Appendix A of the Tri-Regional Guidelines (enclosed) . The SRP is <br /> to be completed and submitted to us and the SJLHD by 26 May 1989. The' <br /> contaminated soil is a continuing source of hydrocarbons to the ground water <br /> and remedial action at this site should begin by eliminating this source. <br /> Include in the SRP a time table for the implementation of the proposed <br /> remediation plan. Soil remediation is ;to be initiated no -later than 30 June <br /> 1.989. <br /> INSTALLATION OF OFF-SITE GROUND WATER MONITORING WELLS <br /> The proposed work for the installation of four additional monitoring wells is <br /> acceptable to us, but it may be necessary oto install additional wells to fully <br /> define the extent of the plume. All necessary permits to conduct the work are <br /> to be obtained from the appropriate local agencies. We have the following <br /> comments and recommendations regarding the proposed work: <br /> 1. We suggest that another monitoring well be installed, in addition .to the <br /> - four-propo-s-ed,. to•define -the southeasItern.extent of-the-plume. _ A possj.blr <br /> location for this well would be on the southeastern corner of the Kettleman " <br /> Lane-Hutchins Street intersection at the Shell Station or nearby. <br /> 2. Soil samples collected from the boreholes for the off-site monitoring wells <br /> are to be screened in the field using a portable vapor meter for possible <br /> selection for laboratory analysis. I If no hydrocarbons are detected in <br /> field screening or visual inspection, the unsaturated soil sample collected <br /> nearest the ground water surface is to be submitted to the laboratory for <br /> BTX&E- and TPH analysis. <br /> If at the conclusion of this work the ground water plume has not been completely <br /> defined ("zero line") , additional investigative work will be required and a work <br /> plan for the work is to be submitted to us and the SJLHD within two weeks of <br /> receiving the laboratory results for this proposed work. Once the plume has been <br />
The URL can be used to link to this page
Your browser does not support the video tag.