Laserfiche WebLink
Brown and Caldwell,r) <br /> ) <br /> Biro Consultants <br /> 723 S Street <br /> Sacramento <br /> California 95814-7092 <br /> (916)444-0123 <br /> FAX(916)444-8437 <br /> August 2, 1991 <br /> AUG 2 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Ms. Laurie A. Cotulla, REHS <br /> San Joaquin County <br /> Environmental Health Division <br /> Post Office Box 2009 <br /> Stockton, California 95201 017-5380-03/1 <br /> Subject: ARCO Station 434 Final Remedial ion Report: Site Code 1341 <br /> Dear Ms. Cotulla: <br /> Enclosed is one copy of the draft Final Remediation Report (FRP)for the above referenced <br /> site. I have included an extra copy of the executive summary to accompany your public. <br /> notice. A complete copy of the draft FRP has been sent to the Lodi Public Libraryto be <br /> available for public review. <br /> In your letter dated April 25, 1991,you requested at verification from Universal Engineering <br /> as to the quantity of soil and water removed front the site, verification from Gibson Oil for <br /> the amount of water they received, and verificatio i from Anderson Landfill as to the amount <br /> of soil they received be included in the FRP. This information is still being collected and will <br /> be sent under separate cover. <br /> If you have any questions, contact me at (916) -0123. <br /> Very truly yours, <br /> BROWN AND CALDWELL CONSULTANTS <br /> �UCc� <br /> Jay C. Lucas <br /> Project Manager <br /> JCL:jrb <br /> cc: Mr. Chuck Carmel, ARCO Products Com any <br /> Mr. Chris Winsor, ARCO Products Company <br /> Regional Water Quality Control Board, Central Valley Region <br />