My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:30:12 PM
Creation date
2/11/2020 11:27:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iz <br /> r <br /> s <br /> CHRONOLOGY <br /> 501 W. RETTLEMAN, LODI <br /> 12/24/86 Pipeline leak confirmed with an estimate of '500-800 <br /> gallons lost. City of Lodi well 240 feet from site <br /> (well 500, deep with a 108' grout) . <br /> 4/8/87 Three monitoring wells installed. Soil and groundwater <br /> contamination confirmed. <br /> 7/17/87 Monitoring wells 4, 5, and 6 installed and soil borings <br /> Bl and B2 drilled. <br /> 7-11/87 Free product removed from W-2 and W-3 . <br /> 11/87 Monitoring wells 7 and 8 installed. <br /> 5-7/88 Free product removed from W-2 and W-3 . <br /> 6/88 Monitoring wells W-2A and W-2B installed. 7 <br /> 4-5/90 Monitoring wells W-1A, W9, W10, W11, W12 were <br /> installed, monitoring well 1 was destroyed, groundwater <br /> extraction well E-1 was installed, and 8 vapor <br /> extraction wells were installed. <br /> 7/91 Vapor extraction testing began. <br /> 12/91 Final Remediation Plan approved. <br /> 10/92 Groundwater extraction began. <br /> 4/93 Groundwater extraction stopped because concentrations <br /> were nondetectable. <br /> 3/95 Groundwater contaminant concentrations were <br /> nondetectable. <br /> 2/96 Vapor extraction stopped because of continued low <br /> influent concentrations . <br /> 10/96 Closure report submitted. <br /> 1/97 PHS/EHD concurs with closure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.