My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:30:12 PM
Creation date
2/11/2020 11:27:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" r <br /> rr yf <br /> 7' <br /> ARCO sites <br /> Page 2 <br /> 1612 Hammer Lane, Stockton ARCO Facility # 548 <br /> PHS/EHD contact - Mary Meays <br /> ARCO owns this property and will continue to operate the <br /> underground storage tanks (UST' s) until the City of Stockton <br /> " decides to widen the street or until the single wall tanks <br /> have to be removed in December 1998 . Prior to removing the <br /> UST' s, monitoring well MW#3 will be destroyed. After the <br /> UST' s have been removed, vapor extraction wells will be <br /> N <br /> installed in the former tank area. <br /> Levels of contamination in the ground water samples from the <br /> �r monitoring wells are about the same as before the water level <br /> was above the top of the screened interval of the monitoring. <br /> well . Levels of contamination in the ground water samples <br /> collected from the vapor extraction wells are high. The vapor <br /> extraction wells were constructed with pea gravel . It was <br /> discussed that the results of the water samples from the vapor <br /> extraction wells are not reflective of ground water since the <br /> wells have not been developed or sufficiently purged. ARCO <br /> does not want to silt in these wells, so it was agreed to <br /> discontinue sampling of the vapor extraction wells . <br /> �+ 225 Cherokee Lane, Lodi ARCO Facility #760 <br /> PHS/EHD contact - Linda Turkatte <br /> After PHS/EHD has received the closure report for this site, <br /> the Regional Water Quality Control Board (RWQCB) will 'be given <br /> 30 days to comment on its closure . <br /> ;F 3212 California Street, Stockton ARCO Facility #21.86 <br /> PHS/EHD contact - Steve Sasson <br /> The plume of ground water contamination at this site appears <br /> to be limited. The vapor well was sampled twice. Quarterly <br /> monitoring will continue. <br /> d <br /> I' 1711 Yosemite, Manteca ARCO Facility #6020 <br /> PHS/EHD contact - Michael Infurna <br /> The RWQCB has been given 30 days to comment on closure of this <br /> site . <br /> 7906 El Dorado Street, Stockton ARCO Facility #2130 <br /> PHS/EHD contact - Michael Infurna <br /> Ground water is currently over the top of the screened <br /> interval of the monitoring wells . The vapor extraction system <br /> will continue operation until the end of the year and then the <br /> site will be monitored. The necessity of confirmation borings <br /> will be determined later. <br /> 1617 Fremont Street, Stockton ARCO Facility #5450 <br /> PHS/EHD contact - Michael Infurna <br /> Another ground water sample will be collected from the <br /> monitoring well and the site will be evaluated for closure. <br /> =i <br />
The URL can be used to link to this page
Your browser does not support the video tag.