My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:44:45 PM
Creation date
2/11/2020 11:28:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yr <br /> :; 12 <br /> PURPOSE <br /> In order to begin soil and groundwater remediation at Station 434, BC has developed <br /> this comprehensive work plan for the County's and Regional Board's review and approval. <br /> The work plan consists of three parts: soil characterization work, installation of a <br /> groundwater extraction well and aquifer testing, and installation of additional off-site <br /> monitoring wells. <br /> The purpose of the soil characterization wor is to better characterize hydrocarbon <br /> occurrence in the vadose zone, particularly between the leak site and monitoring wells W-2 <br /> and W-3. The available data indicate that hydrocarbons in the vadose zone in ;this area <br /> continue to migrate downwards and enter the groundwater. Following the soil <br /> characterization work, the original soil remediatio plan can be modified, as necessary, <br /> prior to implementation. The soil characterization part of this work plan is intended to <br /> supersede the similar November 1988 soil characte zation work plan. <br /> The immediate purpose of the groundwater a traction well is to provide a means of <br /> conducting an aquifer test to determine aquifei characteristics (relevant to the final <br /> groundwater remediation system design) and to induce a cone - of depression in the <br /> groundwater beneath Station 434 to prevent further off-site migration of hy4rocarbon <br /> constituents. The extraction well will be used in t e final remediation system design. The <br /> extraction well portion of this work plan supersedes the March 1988 extraction well work <br /> plan. The question of the discharge of the treated groundwater from the extraction well <br /> has yet to be resolved. Under certain conditions, the City will allow short-term :discharge <br /> (from the extraction well pump test) of treated ater into its sewer system. The City, <br /> however, has refused to allow any long-term discharge of the treated water into ;its sewer <br /> system. Therefore, ARCO will request a National Pollutant Discharge Elimination System <br /> permit be granted at this site for the disposal of mated effluent water. <br /> The purpose of the additional off-site monitoring wells is to better define a "zero line" <br /> of hydrocarbons in the groundwater around Station 434. This information will be useful in <br /> documenting the remediation of the groundwater. Completion of this work will be <br /> dependent on obtaining off-site permission for installation of the additional off-site <br /> monitoring wells. <br /> The three parts of this work plan are sufficiently independent of one another that <br /> implementation of one part need not be tied to another. In the interest of timeliness, the <br /> County and Regional Board should approve all three pans of this work plan <br /> simultaneously. <br /> FIELD METHODS <br /> This section describes the field methods for the on-site soil characterization, on-site <br /> groundwater extraction well installation, and off-site groundwater monitoring wells <br /> installation. The locations of public undergrOLItid utility lines in the Kettleman Lane, <br />
The URL can be used to link to this page
Your browser does not support the video tag.