Laserfiche WebLink
l <br /> r t <br /> Mr. Kyle Christie <br /> April 4, 1995 <br /> Page 5 <br /> SUMMARY OF WORK <br /> Work Completed in Fourth Quarter 1994 <br /> • Continued monitoring SVETS and optimized system performance. <br /> • Prepared and submitted third quarter 1994 groundwater monitoring and remediation <br /> system evaluation report. <br /> • Sampled site groundwater monitoring wells for fourth quarter 1994. Sampling <br /> performed by GTI. <br /> • Prepared SJVUAPCD reports detailing operation and destruction removal efficiency <br /> of the SUETS. <br /> • Replaced, developed, and sampled obstructed well W-2 with a new well installed <br /> in the same borehole. <br /> Work Anticipated During first Quarter 1995 <br /> • Continue monitoring of SVETS and optimization of system performance. <br /> • Prepare and submit fourth quarter 1994 groundwater monitoring and remediation <br /> system evaluation report. <br /> • Sample groundwater monitoring wells for first quarter of 1995. <br /> • Prepare SJVUAPCD reports detailing operation and destruction removal efficiency <br /> of the SVETS. <br /> • Prepare well replacement report for monitoring well W-2. <br /> • Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document. <br /> 13 1 MEP0RTS\4TA94QTRAn <br />