Laserfiche WebLink
Mr. Kyle Christie <br /> January 11, 1995 <br /> Page 5 <br /> i� <br /> • Prepared SJVUAPCD reports detailing operation and destruction removal efficiency <br /> of the SVETS. <br /> • Permitted biofilter system as treatment system at the site. Authority-to-Construct <br /> Permit No. N-1081-1-1 issued by the SJVUAPCD. <br /> Work Anticipated During fourth Quarter 1994 <br /> • Continue monitoring of SVETS and optimization of system performance. <br /> • Preparation and submittal of third quarter 1994 groundwater monitoring and <br /> remediation system evaluation report. <br /> • Sampling of groundwater monitoring wells for fourth quarter of 1994. Sampling to <br /> be performed by GTI. <br /> • Prepare SJVUAPCD reports detailing operation and destruction removal efficiency <br /> of the SVETS. <br /> If you have any questions regarding this quarterly report, please contact me at(916) 444-0123. <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> �CgD <br /> Matt Turner ay utas <br /> Project Manager Cali ornia Registered Geologist #4301 <br /> MTT:JCL:ksc <br /> Enclosures <br /> cc: Ms. Margret Lagorio, San Joaquin County Public Health Services, Environmental <br /> Health Division <br /> Ms. Elizabeth Thayer, California Regional Water Quality Control Board, <br /> Central Valley Region <br /> . Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document. <br /> 1318UREP0RTS13RD94QTR.R Pr <br />