My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003710
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
ARCHIVED REPORTS_XR0003710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 3:47:43 PM
Creation date
2/11/2020 11:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003710
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Sampling Protocol <br /> This attachment documents the procedures followed by Groundwater Technology Inc during the <br /> groundwater monitoring and sampling program for Arco Products Company As requested by Arco, this <br /> attachment will be included with the first set of data delivered to the lead consultant <br /> Included In this attachment are <br /> 1) Groundwater Technology, Inc Standard Operating Procedure No 8, Groundwater Monitoring <br /> 2) Groundwater Technology, Inc Standard Operating Procedure No 9, Water Sampling <br /> Methodology <br /> 3) Groundwater Technology, Inc Standard Operating Procedure No 10, Sampling for Volatiles In <br /> Water (Dissolved Gasoline, Solvents, Etc) <br /> 4) Groundwater Technology, Inc Standard Operating Procedure No 11, Chain-of-Custody <br /> Protocol <br /> The data delivered to the lead consultant each quarter will include <br /> 1) Arco Products Company Chain-of-Custody <br /> 2) Field Report (depth to water/floating product survey) <br /> 3) Groundwater Sample Field Data Sheet <br /> 4) Laboratory Reports <br /> 5) Summary of Groundwater Monitoring Data <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.