My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004171
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
ARCHIVED REPORTS_XR0004171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 3:37:04 PM
Creation date
2/11/2020 11:46:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004171
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> • rtr <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 434 <br /> Address 501 W Kettleman Lane,Lodi, California <br /> ARCO Environmental Engineer Mr Kyle Christie <br /> Consulting Co/Contact Person Brown and Caldwell/Joel Coffman [(916)444-0123] <br /> Consultant Project No 3382 <br /> Primary Agency/Regulatory ID No CA Central Valley RWQCB, San Joaquin County/ <br /> Site Code # 1341 <br /> WORK PERFORMED THIS QUARTER(Second - 1996): <br /> 1 Conducted groundwater momtonng/sampling for second quarter of 1996 Work <br /> conducted by Pacific Environmental Group (PEG) <br /> 2 Submitted groundwater mohrtoring report for first quarter of 1996 <br /> WORK PROPOSED FOR NEXT QUARTER(Third- 1996): <br /> 1 Submit second quarter 1996 groundwater monitoring report <br /> 2 Conduct groundwater monitonng/sampling for third quarter of 1996 Work to be <br /> performed by PEG <br /> 3 Groundwater samples will be analyzed for MTBE <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project Monztonng <br /> Frequency of Groundwater Sampling Wells W-1A, W-2, W-3, W-4, W-5, and W-9 = <br /> quarterly, wells W-2A, W-2B, W-7, W-8, <br /> W-10, W-11, and W-12 = semi-annually <br /> (1st and 3rd quarters) <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On-Site No <br /> Depth to Groundwater(below TOC) 58 76(W-8)to 61 70 ft (W-9) <br /> General Groundwater Flow Direction: South <br /> Approximate Hydraulic Gradient 0 003 <br /> ® This report was prepared in accordance with the standards of the environmental consulting industry at the time it was <br /> prepared It should not be relied upon by parties other than those for whom it was prepared and then only to the extent <br /> of the scope of work which was authorized This report does not guarantee that no additional environmental <br /> contamination beyond that described to this report exists at the site <br /> 33821REPORT512NDQTR96 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.