My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004172
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
ARCHIVED REPORTS_XR0004172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 2:02:14 PM
Creation date
2/11/2020 11:46:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004172
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Products Company VES Operating Report <br /> ' First Quarter 1996 <br /> Facility# 434 <br /> Facility address 501 W Kettleman Lane,Lodi,CA <br /> ARCO engineer Mr Kyle Christie <br /> Consultant[project manager] Brown and Caldwell[Joel Coffman,(916)444-0123] <br /> Lead agency CRWQCB,San Joaquin County Public Health Services, <br /> Environmental Health Division <br /> Reporting period January 1, 1996 through March 31, 1996 <br /> Equipment inventory 5 Hp ROTRON blower with knock-out pot assembly <br /> Bio-filter drum and vessel <br /> Status <br /> A 100 cfm King-Buck catalytic oxidizer was operated at the site from June 1991 through May 1995 The catalytic oxidizer was <br /> removed from the site in May 1995 A vacuum blower and knock-out pot assembly was installed to extract soil vapors for treatment <br /> through an existing bio-filter at the site The bio-filter system was operated from May 1995 through September 1995 In September <br /> 1995,soil vapor extraction at the site was discontinued indefinitely as a result of low influent vapor concentrations <br /> There were no operation and maintenance activities on-site during this reporting period The Permit-To-Operate for the bio-filter system <br /> remains active should the system be re-started in the future <br /> Operating mode System not operating as of 9/25/95 <br /> AQMD permit no N-1081-1-1 <br /> End of period date 3/31/96 <br /> TPH cont end of period(lab,ppmv) NA <br /> Benzene conc end of period(lab,ppmv) NA <br /> Flowrate end of period NA <br /> HC destroyed this period(FID,lbs) NA <br /> HC destroyed this period(lab,lbs) NA <br /> Utility usage <br /> Electric(KWH) NA <br /> Gas(Therms) NA <br /> Pounds of hydrocarbons destroyed/S utilities(Lab,$/lb) NA <br /> I KWH=$0 074 <br /> Operating hours this period 0 <br /> Percent up time 0% <br /> Operating hours to date 35,503 <br /> Date of last oil change NA <br /> Number of auto shut downs NA <br /> Attachments <br /> Summary of Operational Data <br /> Table I Soil Vapor Extraction and Treatment System Influent Data <br /> Table 2 Soil Vapor Extraction Vapor Well Field Data <br /> .Chart 1 TPH-G and Benzene Concentrations vs Time <br /> Chart 2 Cumulative Hydrocarbons Removed vs Time <br />
The URL can be used to link to this page
Your browser does not support the video tag.