My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004173
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
ARCHIVED REPORTS_XR0004173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 3:39:51 PM
Creation date
2/11/2020 11:47:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004173
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" Mr Kyle Christie <br /> February 7, 1996 <br /> Page 3 <br /> The SVETS consists of eight soil vapor extraction wells (VE-1 through VE-8) and a soil vapor <br /> treatment system The soil vapor treatment system is composed of a vacuum compressor pump <br /> connected to a vapor phase bzofilter with a design treatment flow rate of 50 cubic feet per minute <br /> (cfm) of vapor The system is currently operated under Permit-to-Operate No N-1081-1-1 <br /> issued by the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) on <br /> August 1, 1995 Source compliance data have been collected on the biofilter system since start- <br /> upon May 11, 1995 <br /> Operating Conditions This Quarter. The SVETS did not operate this quarter On <br /> September 25, 1995, the SUETS was shut down and began a pulse mode operating schedule <br /> The system will be operated intermittently in an attempt to maximize the efficiency of the <br /> SVETS over time The SVETS will be restarted at the beginning of the first quarter 1996 <br /> SUMMARY OF WORK <br /> Work Completed in Fourth Quarter 1995 <br /> • Submitted third quarter 1995 groundwater monitoring and remediation system <br /> evaluation report <br /> ' <br /> Sampled site groundwater monitoring wells for fourth quarter 1995 Sampling <br /> g <br /> performed by EMCON <br /> Work Anticipated During First Quarter 1996 <br /> • Submit fourth quarter 1995 groundwater monitoring and remediation system <br /> evaluation report <br /> • Sample groundwater monitoring wells for first quarter of 1996 Work to be <br /> performed by Pacific Environmental Group (PEG) <br /> • Prepare SJVUAPCD reports detailing operation and destruction removal <br /> efficiency of the SVETS during the fourth quarter of 1995 <br /> • Restart SVETS in pulse mode operation <br /> Use or disclosure of data continued on this sheet is subject to the restrictionspecified at the 6e beginning o JS S f this <br /> document <br /> 2065\REPORTWTH95QTR DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.