My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004174
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
ARCHIVED REPORTS_XR0004174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 3:38:58 PM
Creation date
2/11/2020 11:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004174
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• r� <br /> r Mr Kyle Chnstie <br /> October 31, 1995 <br /> Page 3 <br /> 1� <br /> accidental releases Because the GWETS operation has been terminated, Industnal Waste <br /> Discharge Permit No 151, that allowed discharge of the treated groundwater to the City of Lodi <br /> industnal sewer, has been suspended <br /> The SVETS consists of eight soil vapor extraction wells (VE-1 through VE-8) and a soil vapor <br /> treatment system The soil vapor treatment system is composed of a vacuum compressor pump <br /> connected to a vapor phase biofilter with a design treatment flow rate of 50 cubic feet per minute <br /> (cfm) of vapor The system is currently operated under Permit-to-Operate No N-1081-1-1 <br /> issued by the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) on <br /> August 1, 1995 Source compliance data have been collected on the biofilter system since start- <br /> up on May 11, 1995 Photoionization detector (P I D ) readings and analytical data collected <br /> from the biofilter influent were presented to SJVUAPCD dunng the third quarter with the <br /> request for Permit-to-Operate No N-1081-1-1 <br /> Operating Conditions This Quarter. The SVETS operated 100 percent of the time at an <br /> average flow rate of 22 cfm during this quarter Vapors were extracted from wells V-3, V-4, <br /> V-5, V-b, V-7, and V-8 The current, historical, and total concentrations of BTEX and TPH-G <br /> in the extracted soil vapor are shown in Table 4 Table 5 summanzes the status of the soil vapor <br /> extraction wells and analytical results from the individual wells Figure 3 represents the inferred <br /> vacuum across the site as provided by measurements taken on September 18, 1995 The line of <br /> "influence" (determined as 0 1 inches of water, vacuum) is approximated by interpolating from <br /> i vacuum readings taken at each well, and adjusting for depth to the well screen <br /> Dunn-0 the third quarter of 1995, 42 pounds (7 gallons) of TPH-G were removed This <br /> represents an average removal rate of about 0 5 pounds per day for this reporting period No <br /> measurable amount of benzene was removed during the third quarter <br /> SUMMARY OF WORK <br /> Work Completed in Third Quarter 1995 <br /> • Continued monitoring SVETS and optimized Biofilter system performance <br /> • Submitted second quarter 1995 groundwater monitonng and remediation system <br /> evaluation report <br /> • Sampled site groundwater monitonng wells for third quarter 1995 Sampling <br /> performed by EMCON <br /> •� Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this document <br /> 2065\REPQRT9\3RD95QTR DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.