Laserfiche WebLink
• r� <br /> r Mr Kyle Chnstie <br /> October 31, 1995 <br /> Page 3 <br /> 1� <br /> accidental releases Because the GWETS operation has been terminated, Industnal Waste <br /> Discharge Permit No 151, that allowed discharge of the treated groundwater to the City of Lodi <br /> industnal sewer, has been suspended <br /> The SVETS consists of eight soil vapor extraction wells (VE-1 through VE-8) and a soil vapor <br /> treatment system The soil vapor treatment system is composed of a vacuum compressor pump <br /> connected to a vapor phase biofilter with a design treatment flow rate of 50 cubic feet per minute <br /> (cfm) of vapor The system is currently operated under Permit-to-Operate No N-1081-1-1 <br /> issued by the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) on <br /> August 1, 1995 Source compliance data have been collected on the biofilter system since start- <br /> up on May 11, 1995 Photoionization detector (P I D ) readings and analytical data collected <br /> from the biofilter influent were presented to SJVUAPCD dunng the third quarter with the <br /> request for Permit-to-Operate No N-1081-1-1 <br /> Operating Conditions This Quarter. The SVETS operated 100 percent of the time at an <br /> average flow rate of 22 cfm during this quarter Vapors were extracted from wells V-3, V-4, <br /> V-5, V-b, V-7, and V-8 The current, historical, and total concentrations of BTEX and TPH-G <br /> in the extracted soil vapor are shown in Table 4 Table 5 summanzes the status of the soil vapor <br /> extraction wells and analytical results from the individual wells Figure 3 represents the inferred <br /> vacuum across the site as provided by measurements taken on September 18, 1995 The line of <br /> "influence" (determined as 0 1 inches of water, vacuum) is approximated by interpolating from <br /> i vacuum readings taken at each well, and adjusting for depth to the well screen <br /> Dunn-0 the third quarter of 1995, 42 pounds (7 gallons) of TPH-G were removed This <br /> represents an average removal rate of about 0 5 pounds per day for this reporting period No <br /> measurable amount of benzene was removed during the third quarter <br /> SUMMARY OF WORK <br /> Work Completed in Third Quarter 1995 <br /> • Continued monitoring SVETS and optimized Biofilter system performance <br /> • Submitted second quarter 1995 groundwater monitonng and remediation system <br /> evaluation report <br /> • Sampled site groundwater monitonng wells for third quarter 1995 Sampling <br /> performed by EMCON <br /> •� Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this document <br /> 2065\REPQRT9\3RD95QTR DOC <br />