Laserfiche WebLink
j <br /> ATLANTIC RICHFIELD COMPANY,STATION 434 <br /> 501 KE'17LEMAN LANE <br /> LODI,CALIFORNIA <br /> This work plan has been prepared for Atlantic Richfield Company (ARCO) Station 434, <br /> located at 501 Kettleman Lane in Loch, California. The work plan will be submitted to <br /> ' r ARCO and the San Joaquin County Environmental Health Department (County). Before <br /> commencing the work at the site,necessary permits will be acquired. <br /> Boreholes <br /> Brown and Caldwell (BC) will supervise the drilling of two boreholes and the <br /> Installation of groundwater monitoring wells in each of the two boreholes. The locations <br /> are shown on Figure 1. Two boreholes will be drilled within 5 feet of the existing <br /> I; monitoring well W-2. The boreholes will be drilled using a tn!ck-mounted drilling rig. <br /> The depth to.groundwater is approximately 55 feet. One bomhoie will be drilled to <br /> ' approximately 65 feet and one borehole will be drilled to approximately 90 feet. <br /> h. <br /> r Soil Sampling Procedures <br /> Soil samples will be taken from the deeper borehole beginning at 55 feet to the bottom <br /> f. of the hole (90 feet). Lithology hereon ground surface to 55 feet is shown or, the log for <br /> monitoring well W-2. With the exception of the zones between approximately 57 to 65 feet <br /> and 80 to 90 feet, samples will be taken at 5-foot intervals. In these two zones samples <br /> will be taken every 2.5 feet to determine the best 5-foot interval to be screened. Samples <br /> lei will be obtained using an 18-inch split-spoon drive sampler. The sampler will be driven <br /> ' into undisturbed sail to abrain rhe soil samples. Samples will then be visually inspected in <br /> the field to identify lithology. A lithologic Iog will be constructed for the 55 to 90-foot <br /> portion of the deeper borehole. ?' <br /> Groundwater Monitoring Wells <br /> Daring monitoring well installation, the following procedures will be used. These <br /> iia methods will ensure the proper identification of groundwater quality beneath the site. <br /> } -? Groundwater Monitoring 'Well Installation. Two groundwater monitoring wells will be <br /> installed in the boreholes shown on Figure 1. <br /> fA The wells will be completed with 2-inch-diameter polyviny! chloride (PVC) <br /> flush-threaded casing and will be screened with 0.020-inch slotted casing. One well will be <br /> —- -- -� screened-from-approximately-65--feet-to-60-feet-and-one_well--will be-screened--from T -- -- <br /> approximately 90 feet to 85 feet. Blank casing will extend from the top of.the perforated <br /> section to ground surface. The actual depths of the boreholes and screened intervals of <br /> L' the wells will depend on conditions encountered during drilling. <br />