My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012740
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
ARCHIVED REPORTS_XR0012740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 6:44:23 PM
Creation date
2/11/2020 11:53:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012740
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
661
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br /> �W®R <br /> � _�-- ,T_. �.a•�•�- =3,.so-�sm,.,,� � �� ��',-�� � "-�,�'�,�fid' <br /> kiM, a al <br /> 3 <br /> Groundwater Monitoring Wells <br /> During monitoring well installation, the following procedures <br /> will be used. These methods will ensure the proper identification of <br /> groundwater quality beneath the site. <br /> Groundwater Monitoring Well Installation. Three groundwater <br /> monitoring wells will be installed in the boreholes shown on <br /> Figure 1. <br /> The wells will be completed with 2-inch--diameter polyvinyl <br /> chloride (PVC) flush-threaded casing and will be screened with <br /> 0.020-inch slotted casing from 20 feet below the groundwater surface <br /> to 10 feet above the groundwater surface. Blank casing will extend <br /> from the top of the perforated section to ground surface. The actual <br /> depths of the boreholes and screened intervals of the wells will <br /> depend on conditions encountered during drilling. <br /> The wells will be packed with No. 20/40 sand from the bottom of <br /> the screen to approximately 2 feet above the top of the screen. A <br /> - 2-foot seal of bentonite pellets will be placed on the top of the <br /> sand pack. The wells will be grouted with bentonite-cement slurry or <br /> neat cement from the top of the bentonite seal to the surface. The <br /> wells will be completed below grade, fitted with top and bottom PVC <br /> (" caps, and have locking covers installed. Typical well construction <br /> s E is illustrated on Figure 2. <br /> The monitoring wells willnot be completed opposite significant <br /> clay zones nor will monitoring wells penetrate significant clay zones <br /> that might allow for downward migration of contamination into. lower <br /> ,)l aquifers. <br /> Well Development and Groundwater Samples. Each well installed <br /> will tie developed with an air-lift pump until clean, sediment-free <br /> water is produced from the well. The length of development time <br /> will vary depending upon field conditions. Water produced during <br /> development and sampling will be contained on site. ARCO will be <br /> responsible for the disposal of water and product collected. Prior <br /> j to and following development, the thickness of free product, if any, <br /> r will be gauged. <br /> Following proper development of each well, a nitrogen--driven <br /> bladder pump or stainless steel bailer will be used to evacuate an <br /> additional amount of water before samples are taken. The amount of <br /> y � !� water evacuated will be defined by the stabilizationof pH and <br /> electrcial conductivity readings for three consecutive measurements <br /> taken 5 minutes apart. When pH and electrical conductivity have been <br /> x -z .- de..termined---to--have--stabilized,--water--samples-wi-11-be--collected-and ---- -- -- ----- -- <br /> submitted to the laboratory * to be analyzed for BTX (EPA 602) , and <br /> total petroleum fuel hydrocarbons (modified EPA 8015) . Sample <br /> w <br /> EM <br /> PENNINE 1�9=21 III <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.