Laserfiche WebLink
__y <br /> IRRI 111111 g lip <br /> APDL-NDIX 4 <br /> ADDITIONAL SCOPE OF WORK <br /> Brown and Caldwell (DC)recornmends the following additional work: <br /> - I. S(ratigraplt-te Study. Lithologic information from existing well logs and geologic <br /> cross sections for the local and regional area will be analyzed. The purpose of <br /> this analysis is to determine the stratigraphic interconnection between the aquifers <br /> underlying the area. Any thick, continuous clay zone(s) that might block vertical <br /> migration of groundwater will be identified. In addition, an analysis of the <br /> regional stratigraphy may indicate whether agricultural pumping west of the City <br /> of Lodi (City) in the spring and summer months or pumping of nearby municipal <br /> wells might affect the extraction well's capture zone. <br /> T2. Extraction Well Installation. The extraction well will be located near monitoring <br /> Well W-2. This Iocation is close to the leak site and area of highest groundwater <br /> coniarnination. The extraction well will have a pumping rate of about 30 gallons <br /> per minute (gpm). The extraction well will be about 100 feet deep and will be <br /> screened from slightly above the water table to the total depth of the well. The <br /> exact depth of the extraction well will be dependent on the results of the <br /> e -: stratigraphic study. <br /> 3. Aquifer Testing. An aquifer test will be required to determine aquifer parameters, <br /> F � the pumping rate necessary to capture the contaminated plume, and the <br /> groundwater reinjection rate. The aquifer test will be used to detennine the <br /> p. following parameters. <br /> • Maximum yield of the aquifer <br /> • Transmissivity and permeability of the aquifer <br /> Storage coefficient of the aquifer <br /> r _ Drawdown at the extraction well <br /> Drawdown at the monitoring wells <br /> f t-� Additional sampling data on benzene,toluene,xylene(BTX)concentrations <br /> The aquifer test will entail installation of the extraction well, a 72-hour pump test ' <br /> t's <br /> with a mobile groundwater treatment system,and data interpretation. <br /> L Municipal Well 12 Pump Test. . Drawdown in the eight shallow monitoring wells will <br /> be measured while municipal well 12 (Well 12) pumps groundwater from she deeper <br /> aquifer into the City's storm sewer. This information will be important in <br /> establishing the degree of hydraulic communication between the deep and shallow i <br /> aquifers in the immediate vicinity of Well 12. Establishing the amount of hydraulic <br /> communication will aid the City in determining whether Well 12 can safely be <br /> -----returned-to-;service. BC recor-trnends sampling Well 12 during the pump test for - - - ----- - -- <br /> BTX:constituents (EPA Method 602). The C;ty's permission and cooperation will be <br /> t necessary to perform this pump test,to determine the pumping rate and duration of. <br /> rthe test, and to ensure that pumping of nearby municipal wells does not interfere <br /> 1 with the Well 12 pump test. <br />