My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012740
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
ARCHIVED REPORTS_XR0012740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 6:44:23 PM
Creation date
2/11/2020 11:53:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012740
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
661
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- -�' <br /> ft- 11' ' <br /> -�4 a ,+ + _ _i t4 �� � y ! � �t <br /> Mr. H. C. Winsor <br /> September 16. 1987 <br /> Page 9 <br /> The plume is insufficiently characterized <br /> -- <br /> station. The change in gradient between west of April and July the ARCO <br /> indicates <br /> the Plume may have migrated wr-t. SC recommends the installation of <br /> two additional monitoring w_ •s west <br /> determine whether this has ha of <br /> ppen�d, the ARCO station to <br /> BC is currently designing a remedial system for the station. The <br /> remedial system will include soil venting in the vicinity of the <br /> leak site and a groundwater recovery system with air stripping and <br /> Possibly carbon filtration. Finalization of the remedial system <br /> design will incorporate data from the two <br /> and sewer discharge requirements currently being established b the <br /> e Cit <br /> City. We also recommend that the and additional wells <br /> -' of service. Y continue to hold Well 12 out <br /> If You have any questions <br /> or <br /> Phillips ar Ms, Jeanne Wallb rg at (916)comments,444a-012 Contact Mr. Larry <br /> t <br /> 1 �. <br /> � f Very truly yours, <br /> BROWN AND CALDWELL <br /> p t Robert A. Witzgall <br /> Chief Engineer <br /> P � � �i.h ate.l�r� .r• � - <br /> Lawrence E. Phillifps <br /> `_d Registered Geologist <br /> 3710 <br /> RAW:LEP:mjd <br /> t v Enclosures (4) <br /> f <br /> cc/enc: 'Ms. Karen Schultheis ARCO Pet1 <br /> San Mateo Petroleum Products Company, <br /> j !411 Mr. Hank Sheetz, ARCO Petroleum Products Company, <br /> YI <br /> Pleasanton P <br /> Mr. Steve Boll, California Regional Water <br /> Board, Sacramento g Quality Control <br /> X y 4s. Laurie <br /> - otulla, San Joaquin Local Health District, <br /> -- -- - Mr._FranFotkas y of <br /> Cat Lodi, nodi. - --- - --- <br /> -- <br /> 3 <br /> ..� BROWN AND CALDWELL <br /> { V <br /> r - 7735SiREEf SACRAMENI0,CA 95B14.�91B1944p173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.