Laserfiche WebLink
c�PRXOX.. FAIR <br /> CHAPTER 2 <br /> FIELD METHODS <br /> During the week of April 6, 1987, three groundwater monitoring <br /> wells were installed. Soil boreholes were drilled by P.C. <br /> Exploration, Inc., with a truck-mounted drilling rig equipped with <br /> 1 . 4-inch inside-diameter and 8-inch outside-diameter hollow-stem <br /> augers. P.C. Exploration, Inc. , ha, a C-57 contractors license. <br /> Locations of the three monitoring wells are shown on Figure 2-1. <br /> Each borehole was advanced to approximately 70 feet, or about 20 <br /> feet below the groundwater surface. Soil samples for lithologic <br /> '! classification and potential laboratory analyses were collected at <br /> ie 5-foot intervals by using an 18-inch-long by 2-inch-diameter Idodified <br /> California type sampler with 6-inch-long brass tube liners. The <br /> s drive sampler was driven ahead of the auger into undisturbed soil. <br /> Each borehole was logged from the samples taken at 5-foot intervals, <br /> r using the Unified Soil Classification system. Borehole logs are <br /> presented in Appendix C. Soil samples were screened in the field for <br /> G organic vapors with a photoionization detector (PID) , and those <br /> samples that contained organic vapors were retained for potential <br /> laboratory analyses. The ends of the tubes were covered with foil <br /> ! ± and a plastic cap taped to the tube. These samples were stored on <br /> I-A ice from collection through delivery to the Brown and Caldwell State <br /> certified analytical laboratory in Emeryville, California. Cuttings <br /> from each borehole were containerized and sealed in 55-gallon drums <br /> and_ '' tests temporarily stored on site pending results of the analytical <br /> �h A monitoring well was then installed in each borehole by <br /> i inserting 2-inch inside-diameter, Schedule 40 polyvinyl chloride <br /> (PVC) casing with 30 feet of 0.020-inch slotted well screen (0.020 <br /> F4xa inch slots) attached to the 'bottom. The perforated casing extends <br /> approximately 20 feet below the water table and 10 feet above the <br /> water table in order to accommodate water table fluctuations and to <br /> 5 +�, detect free floating product. A bottom plug was installed at the <br /> bottom of the perforated interval. <br /> +4+. To gravel pack the well, coarse aquarium sand was poured directly <br /> # through the augers as the augers were gradually removed from the <br /> L.s borehole. A bentonite seal was placed immediately above the gravel <br /> e <br /> _ <br /> anau <br /> -pack dthers--were--then—removed--from -tile bThe - -__- <br /> F g _orehole.T <br /> + remaining annular space of each well was filled with concrete on <br /> April ;8 and 9, 1987. Each well was completed at grade with a <br /> f watertight utility box. The construction details for each well are <br /> included in Appendix D. <br />