Laserfiche WebLink
ar � <br /> T <br /> e <br /> 29 <br /> 2. Updating equipment or procedures to be used on site based on new information <br /> gathered during the site investigation. <br /> 3. Inspecting all personal protective equipment (PPE) prior to on-site use. <br /> 4. Assisting the PM in documenting compliance with the S'FW by completing the <br /> standard BC forms. <br /> 5• Assisting in and evaluating the effectiveness of decontamination procedures for <br /> personnel, protective equipment, sampling equipment and containers, and heavy <br /> equipment and vehicles. <br /> 6• Enforcing the "buddy system, as appropriate for site activities. <br /> 7• Posting location and route to the nearest medical facility; arranging for <br /> emergency transportation to the nearest medical facility. <br /> 8. Posting the telephone numbers of local public emergency services i.e. <br /> and fire. , police r" . <br /> t <br /> i 9. Stopping operations that threaten the health and safety of the field t <br /> - t } rounding populace. team or <br /> suE <br /> l <br /> : 10. Observing field team members for signs of exposure, tions <br /> stress, or other condi ' <br /> related to preexisting physical conditions of team members. <br /> The following is a reference list of project contacts: <br /> i Client: <br /> Mr. Kyle Christie <br /> ARCO Products Company <br /> f (415) 57I-2434 <br /> Regulatory Agency: Mr. Gordon Boggs <br /> Regional Board <br /> (916) 361-5740 <br /> BC Project Manager. <br /> Mr. Larry Phillips <br /> { t <br /> (916) 444-0123 <br /> BC Health & Safety Officer: Ms. Pam Bare <br /> ----�_.- ---- ------ ------ - ------- (91�) 444-.0123..--- ------ --.....--------- ------ --------- ------- ----- ---- -- <br /> t BC Project Geologist Ms. Jeanne Wallber <br /> and g <br /> BC Site Safety Officer: (916) 444-0123 <br /> Subcontractor(s): <br /> To be determined <br /> 1 4 <br /> i <br /> k <br />