Laserfiche WebLink
J <br /> f <br /> 2-4 <br /> r• . <br /> A monitoring well as constructed in each borehole by inserting a 2-inch-inside-diameter, <br /> I Schedule 40 polyvinyl chlorid;; (PVC) casing with 25 feet of 0.020-inch slotted well screen <br /> ! attached to the bottom. The PCrfomted casing extends approximately 20 feet below the water <br /> table and 5 feet above the water table in order to accommodate water table fluctuations. A <br /> bottom plug was installed at the bottom of the perforated interval. <br /> I t <br /> To filter pack the well, Number 3 size sand was poured directly through the augers as the <br /> i s augers were gradually removed from the borehole. A bentonite seal was placed immediately <br /> above the gravel pack and the augers were then removed from the borehole. The remaining <br /> 0 annular space of each well was filled with a bentonite/cement slurry. Each well was completed <br /> at grade with a CNI box. <br /> r Extraction Well <br /> The extraction well borehole was advanced to approximately 80 feet,or about 20 feet below <br /> the groundwater surface using 6-inch hollow-stem augers. Soil samples were not collected The <br /> borehole was continuously cored from the <br /> ew the <br /> water table using a 5-foot-long, 3-inch-diameter core barreundwater l.The core barrelle to a depth of was asedriven ahead <br /> of the auger into undisturbed soil. The borehole was logged from the continuous core from 60 <br /> to 81 feet below ground surface using the Unified Soil Classification system. The borehole log <br /> is presented in Appendix A. One soil sample was collected from the continuous cors for grain <br /> --� size analysis to assist in selection of the well screen size. The grain size analysis ,and <br /> }. .� interpretation am included as Appendix B. The borehole was then reamed out to total depth <br /> using 12-inch augers. Cuttings from the groundwater extraction well borehole were sioresl on <br /> E. visquine on site. <br /> ' A groundwater extraction well was then constructed in the borehole by inserting a 6-inch- <br /> inch slotted well side-diameter,Schedule 40 PVC casing with 25 feet of 0.020-inscreen attached <br /> to the bottom. The perforated casing extends approximately 20 feet below the water table and <br /> 5 feet above the water table. A bottom plug was installed at the bottom of the perforated <br /> interval. <br /> i To filter pack the well,Number I L.onestar Sand was poured directly through the augers <br /> �f as the augers were gradually removed from the borehole. The sand was filled to roughly 2 feet <br /> above the screened interval. A bentonite seal was placed immediately above the gravel pack and <br /> [ the augers were then removed from the borehole. The remaining annular space of the well was <br /> filled with a concrete/bentonite slurry. The well as completed at grade with a CNI box <br /> plumbed for two pumps. <br /> -- -- Vapor_Extraction <br /> -Wells— - <br /> I <br /> Each vapor extraction borehole was advanced to approximately 55 feet below ground surface <br /> using 10-inch hollow-stem augers, For vapor extraction wells V-2, V-6, V-7,and V-8,samples <br /> for lithologfc classification end laboratory analyses were collected at 5-foot intervals. For the <br /> j � uemaining vapor extraction wells soil sampling was conducted only if field evidence of <br />