My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
31400
>
3500 - Local Oversight Program
>
PR0545345
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 5:14:58 PM
Creation date
2/11/2020 4:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545345
PE
3528
FACILITY_ID
FA0002994
FACILITY_NAME
NEW JERUSALEM SCHOOL
STREET_NUMBER
31400
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25527012
CURRENT_STATUS
02
SITE_LOCATION
31400 S KOSTER RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSURE CHRONOLOGY FOR 34100 S KOSTER RD,NEW <br /> r JERUSULEM SCHOOL, TRACY CA <br /> Carol Oz, May 13,`1999 <br /> f � <br /> j June 6, 1989 Two USTs removed under PHS/EHD permit (Tank#1-1,000gal diesel <br /> and#2-350 gal. diesel/gasoline). Odor and discoloration observed in <br /> soil below tank 92. <br /> July 20, 1989 Soil sample results evidence TPHd and BTEX contamination. <br /> Aug. 9, 1989 Prop 65 and UAR completed. <br /> Feb. 1, 1994 Site entered on contaminated site list <br /> Sept. 10, 1996 Site entered LOP. NOR sent on 9/18/96. <br /> Nov. 18, 1996 Preliminary investigation. Three borings constructed to 10 feet. <br /> Nov. 22, 1996 Soil and water samples evidenced TPHg and BTEX. <br /> Aug. 17, 1998 PHS/EHD sent letter requiring an investigative work plan. <br /> Nov. 19, 1998 Approved work plan for borings and ';MW installation. <br /> Dec. 21, 1998 Observed installation of 3 MWs on site. <br /> April 19, 1999 Report of findings for borings and MW sampling evidence Non <br /> detectable concentrations of TPHg and BTEX. Two consecutive <br /> j quarterly monitoring events at site evidence ND results. <br /> August 26, 1999 Migration Potential Modeling Report and Monitor Well Closure <br /> Plan received. Migration potential of contaminant plume reported <br /> as minimal, 0.3 ft/yr. - <br /> f <br /> 1 <br /> i <br /> 1 . <br /> i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.