My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
31400
>
3500 - Local Oversight Program
>
PR0545345
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 5:14:58 PM
Creation date
2/11/2020 4:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545345
PE
3528
FACILITY_ID
FA0002994
FACILITY_NAME
NEW JERUSALEM SCHOOL
STREET_NUMBER
31400
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25527012
CURRENT_STATUS
02
SITE_LOCATION
31400 S KOSTER RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 'New Jerusalem Elem. School Dist. -2- February 26, 1999 { <br /> 1`. help the responsible party undertake the necessary corrective action in a cost-effective, efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> ` alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> 'i <br /> the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible p party to undertake �J <br /> interim remedial-action after: (1)notifying the_regulatory agency of the proposed action, <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the re uirem <br /> q ent for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval• Only corrective action costs required b the regulatory agency t <br /> q,� Y g ry g Y o <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing, you are required to obtain preapproval of costs for <br /> all future corrective action work If you do not obtain three bids and cost preapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact me at(916)227-4411. <br /> Sincerely, <br /> Sandy Gill <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr. Gordon Boggs Ms. Margaret Lagorio <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> i <br /> California Environmental Protection Agency <br /> �� Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.